|
SGM Engineering, Inc.
<br />City of Sunny Isles Beach RFP No. 12-04-02
<br />Continuing Professional Architectural & Engineering Services
<br />Firms Only (CCNA)
<br />Section 2 - Qualifications
<br />
<br />
<br />Relevant Experience and Past Performance
<br />SGM has a long history of successful work with Florida municipalities and School Districts. Specifically, one of the
<br />unique aspects of working with continuing contracts is the ability to be on call and provide immediate response to
<br />the needs of the City for challenges to solve. Our past performance with Municipalities is an example of our ability to
<br />adapt and respond to each municipality regardless size, complexity, or use.
<br />
<br />SGM has been providing MEP design services for over 21 years. SGM has the ability to produce quantities of
<br />drawings and documentation on accelerated schedules to expedite design review meetings and reduce Advertise
<br />and Award Contract periods, thereby removing any impact on project implementation plans. SGM„s library provides
<br />the technical staff with reference documentation in a timely manner. We have a significant collection of current
<br />standards, specifications and reference drawings. Below are the continuing contracts SGM currently holds.
<br /> City of Tampa – A/E Work Order Contracts for Services as Needed
<br />Contract reference name, address, and telephone number
<br />Jim Greiner, P.E., City of Tampa DPW, 4th Floor North, 306 E. Jackson Street, Tampa, FL 33602, (813) 274-8598
<br />
<br />Nature of your firm’s responsibility on this contract
<br />SGM is providing Mechanical, Electrical, Plumbing, Fire Protection Engineering Design, Construction
<br />Administration, and Commissioning services for this A/E work order contract for Services on as needed. SGM is
<br />commissioned to provide engineering design services in areas of: HVAC, IAQ, lighting , power, plumbing, fire alarm,
<br />CC-TV/ security, systems/audio, LEED and construction administration throughout the City.
<br />
<br />SGM‟s services include but are not limited to:
<br /> Program and Scope Verification
<br /> Schematic, design development, permitable construction drawings, specs and construction administration
<br />including the close-out documents
<br /> Peer review, feasibility studies and budgeting
<br /> Trouble shooting for on-going problems in existing facilities
<br /> Renovation replacement for existing chillers, cooling towers, condenser pumps, primary/secondary chilled
<br />water pumps, VFD's, VAV's, Building Automation System, Laboratory systems, library, kitchen/cafeteria,
<br />offices, computer/ IT rooms, emergency power systems, lightning protections, warehouse, community
<br />centers and auditoriums
<br /> Review, comment, and approval of design documents, and final construction drawings and specifications
<br /> Commissioning/ retro-commissioning/ or re-commissioning of existing facilities
<br /> Contract administration and inspection services for construction/re novation projects
<br /> Inspection and reporting services for existing MEP Systems to identify potential problems that related to, but
<br />not limited to materials and workmanship, and system age. Recommended solutions to identified problems
<br />included a detailed cost estimate.
<br /> Review and comment services related to warranty service requests
<br /> Technical support in matters regarding MEP systems to City Staff
<br /> Technical support by the use of other consultants when specialized areas of expertise
<br />
<br />Contract term – start and end date
<br />2010 – 2012
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
|