My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SGM Engineering MEP
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
SGM Engineering MEP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2012 2:50:18 PM
Creation date
6/11/2012 2:48:12 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SGM Engineering, Inc. <br />City of Sunny Isles Beach RFP No. 12-04-02 <br />Continuing Professional Architectural & Engineering Services <br />Firms Only (CCNA) <br />Section 2 - Qualifications <br /> <br /> <br /> <br />Town of Palm Beach – Electrical and Mechanical Engineering Consultants <br />Contract reference name, email address, and telephone number <br />Michael Roach, PE, MRoach@TownofPalmBeach.com 561-838-5440 <br /> <br />Nature of your firm’s responsibility on this contract <br />SGM is providing Mechanical, Electrical, Plumbing, Fire Protection Engineering Design, Construction <br />Administration, and Commissioning services for this A/E work order contract for Ser vices on as needed. SGM is <br />commissioned to provide engineering design services in areas of: HVAC, IAQ, lighting, power, plumbing, fire alarm, <br />CC-TV/ security, systems/audio, LEED and construction administration throughout the Town of Palm Beach. <br /> <br />SGM‟s services include but are not limited to: <br /> Program and Scope Verification <br /> Schematic, design development, permitable construction drawings, specs and construction administration <br />including the close-out documents <br /> Peer review, feasibility studies and budgeting <br /> Trouble shooting for on-going problems in existing facilities <br /> Renovation replacement for existing chillers, cooling towers, condenser pumps, primary/secondary chilled <br />water pumps, VFD's, VAV's, Building Automation System, Laboratory systems, library, kitchen/cafeteria, <br />offices, computer/ IT rooms, emergency power systems, lightning protections, warehouse, community <br />centers and auditoriums <br /> Review, comment, and approval of design documents, and final construction drawings and specifications <br /> Commissioning/ retro-commissioning/ or re-commissioning of existing facilities <br /> Contract administration and inspection services for construction/renovation projects <br /> Inspection and reporting services for existing MEP Systems to identify potential problems that related to, but <br />not limited to materials and workmanship, and system age. Recommended solutions to identified problems <br />included a detailed cost estimate. <br /> Review and comment services related to warranty service requests <br /> Technical support in matters regarding MEP systems to Town Staff <br /> Technical support by the use of other consultants when specialized areas of expertise <br /> <br />Contract term – start and end date <br />2009 – 2015 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.