Laserfiche WebLink
SGM Engineering, Inc. <br />City of Sunny Isles Beach RFP No. 12-04-02 <br />Continuing Professional Architectural & Engineering Services <br />Firms Only (CCNA) <br />Section 2 - Qualifications <br /> <br /> <br /> <br />Town of Fort Myers Beach – Ongoing Mechanical, Electrical and Controls Professional Servi ces <br />Contract reference name, address, and telephone number <br />Peter Boers, 2523 Estero Boulevard, Fort Myers Beach, FL 33931, 239-765-0202 <br /> <br />Nature of your firm’s responsibility on this contract <br />SGM is providing Mechanical Electrical, Engineering and Controls Design services for this A/E work order contract <br />for Services on as needed. SGM is commissioned to provide engineering design services in areas of: HVAC, IAQ, <br />lighting, power, plumbing, fire alarm, CC-TV/ security, systems/audio, LEED and construction administration <br />throughout the Town. <br /> <br />SGM‟s services include but are not limited to: <br /> Program and Scope Verification <br /> Schematic, design development, permitable construction drawings, specs and construction administration <br />including the close-out documents <br /> Peer review, feasibility studies and budgeting <br /> Trouble shooting for on-going problems in existing facilities <br /> Renovation replacement for existing chillers, cooling towers, condenser pumps, primary/secondary chilled <br />water pumps, VFD's, VAV's, Building Automation System, Laboratory systems, library, kitchen/cafeteria, <br />offices, computer/ IT rooms, emergency power systems, lightning protections, warehouse, community <br />centers and auditoriums <br /> Review, comment, and approval of design documents, and final construction drawings and specifications <br /> Commissioning/ retro-commissioning/ or re-commissioning of existing facilities <br /> Contract administration and inspection services for construction/renovation projects <br /> Inspection and reporting services for existing MEP Systems to identify potential problems that related to, but <br />not limited to materials and workmanship, and system age. Recommended solutions to identified problems <br />included a detailed cost estimate. <br /> Review and comment services related to warranty service requests <br /> Technical support in matters regarding MEP systems to Town Staff <br /> Technical support by the use of other consultants when specialized areas of expertise <br /> <br />Contract term – start and end date <br />2011 – 2016 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />