My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SGM Engineering MEP
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
SGM Engineering MEP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2012 2:50:18 PM
Creation date
6/11/2012 2:48:12 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SGM Engineering, Inc. <br />City of Sunny Isles Beach RFP No. 12-04-02 <br />Continuing Professional Architectural & Engineering Services <br />Firms Only (CCNA) <br />Section 2 - Qualifications <br /> <br /> <br /> <br />Lake County Government – Continued On-Call Commissioning / Retro-Commissioning Services <br />Contract reference name, address, and telephone number <br />Susan Dugan, 315 W. Main Street, Room 441, Tavares, FL 32778, (352) 343-9839 <br /> <br />Nature of your firm’s responsibility on this contract <br />SGM is providing on-call commissioning, retro-commissioning, and systems installation inspection for various <br />projects. Systems subject to commissioning or inspection include but are not limited to HVAC, Plumbing, Electrical <br />including emergency power, Fire/Life Safety, Building Envelopes, Utility Plants, Lighting, Building Security and <br />Interface with Building Management Systems (BMS). Some retro commissioning projects may be part of the <br />implementation of the County‟s Energy Efficiency Conservation Block Grant (EECBG) funding, which may require <br />measurement and verification expertise, and experience with evaluating systems for energy efficient operations. <br /> <br />SGM‟s services include but are not limited to: <br /> Ensure that the design objectives and intent are clearly documented <br /> Perform a focused review of the design drawings and specifications <br /> Develop a Commissioning Plan and Commission specifications <br /> Conduct a scoping meeting, review commissioning process with the commissioning team members <br /> Review submittals of commissioned equipment and systems, including detailed start-up procedures <br /> Attend selected planning and job-site meetings to obtain information on construction progress <br /> Performing installation verification and installation inspection site visits; verifying that systems are properly <br />installed according to the contract documents and manufacturer‟s instructions. <br /> Work with the CM developing start-up plans and start-up documentation formats <br /> Provide checkout and performance verification, with pre-functional checklists completed before functional <br />testing <br /> Observing an appropriate sample of start-up and checkout by the installing contractors <br /> Observing an appropriate sample of testing, adjusting and balancing by the test and balance contractor <br /> Documents that the checklists and startup were co mpleted according to the approved plans, witnesses <br />startup of selected equipment <br /> Develop specific equipment and system functional performance test procedures, document procedures <br />executed by the subcontractors <br /> Review the O&M documentation for completeness, ensuring that Commissioning is completed before <br />Substantial Completion <br /> Review, pre-approve and coordinate the training provided by the subcontractors and verify that it was <br />completed. <br /> Observing functional and performance tests with the installing contractor <br /> Providing comments based on start-up and functional performance testing results <br /> Perform re-testing of systems that initially failed to meet desired functional test criteria and were corrected. <br /> Completing a commissioning report and systems manual <br /> Near-Warranty End or Post-Occupancy Review <br /> <br />Contract term – start and end date <br />2010 – 2011 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.