Laserfiche WebLink
SGM Engineering, Inc. <br />City of Sunny Isles Beach RFP No. 12-04-02 <br />Continuing Professional Architectural & Engineering Services <br />Firms Only (CCNA) <br />Section 2 - Qualifications <br /> <br /> <br /> <br />St. Johns County – Continuing MEP Services <br />Contract reference name, address, and telephone number <br />Gene Burns, 2446 Dobbs Road, St. Augustine, FL, (904) 209-0402 <br /> <br />Nature of your firm’s responsibility on this contract <br />Mechanical, Electrical, Plumbing, Fire Protection Engineering Design, Construction Administration, Commissioning. <br />This is a continuing service contract for Mechanical / Electrical/ Plumbing Engin eering Services. SGM is <br />commissioned to provide engineering design services in areas of: HVAC, IAQ, lighting, power, plumbing, fire alarm, <br />CC-TV/ security, systems/audio, LEED and construction administration throughout the County. <br /> <br />The services included but were not limited to: <br /> Program and Scope Verification <br /> Schematic, design development, permitable construction drawings, specs and construction administration <br />including the close-out documents <br /> Peer review, feasibility studies and budgeting <br /> Trouble shooting for on-going problems in existing facilities <br /> Renovation replacement for existing chillers, cooling towers, condenser pumps, primary/secondary chilled <br />water pumps, VFD's, VAV's, Building Automation System, Laboratory systems, library, kitchen/cafeteria, <br />offices, computer/ IT rooms, emergency power systems, lightning protections, warehouse, community <br />centers and auditoriums <br /> Review, comment, and approval of design documents, and final construction drawings and specifications <br /> Commissioning/ retro-commissioning/ or re-commissioning of existing facilities <br /> Contract administration and inspection services for construction/renovation projects <br /> Inspection and reporting services for existing MEP Systems to identify potential problems that related to, but <br />not limited to m aterials and workmanship, and system age. Recommended solutions to identified problems <br />included a detailed cost estimate. <br /> Review and comment services related to warranty service requests <br /> Technical support in matters regarding MEP systems to County Staff <br /> Technical support by the use of other consultants when specialized areas of expertise <br /> <br />Contract term – start and end date <br />2008 – 2012 <br /> <br />Identify project type <br />This contract consisted of renovations of occupied campuses. <br /> <br /> <br /> <br />