Laserfiche WebLink
Jose Lizasoain, P.E., CxA <br />Project Manager / Mechanical Engineer <br /> <br />Mr. Lizasoain is an experienced HVAC Engineer for municipal, administrative, <br />commercial and institutional buildings for the government and private sector. Mr. <br />Lizasoain is also a Certified Commissioning Agent committed to providing quality <br />commissioning services from early in the design phase, through construction and <br />into the warranty period with the ability to oversee commissioning activities for <br />facilities, while meeting the highest level of LEED building certification feasible. Mr. <br />Lizasoain has acted as the principal commissioning authority for at least five project <br />over 50,000 square feet and has extensive knowledge and expertise in the follow: <br />energy-efficient equipment design and control strategy optimization; writing <br />commissioning specifications and test procedures, direct digital control (DDC) <br />systems; monitoring and analyzing system operations using energy management <br />control system trending and stand-along data logging equipment; commissioning <br />management; troubleshooting; and sustainable design. <br />For cooling, Jose is experienced with the design of chilled water systems with a <br />primary and secondary loop system and with air and water cooled chillers. For <br />heating, Jose is experienced with the design of water and gas fired boilers, and hot <br />water systems at 180 degrees F. <br />As an ACG Certified Commissioning Agent, Mr. Lizasoain has managed LEED- <br />certification and design; provided commissioning and advanced commissioning; <br />has experience with controllable systems (lighting, thermal comfort), water <br />efficiency, energy efficiency, and indoor environmental quality; experience with <br />materials selection including recycled materials and content and low-emitting <br />materials selection; and experience with materials reuse. <br />Project Experience <br />2012, Flagler County Courthouse Annex Sherriff’s Department Renovations <br />and Energy Efficient Upgrades, Bunnell, FL – Mr. Lizasoain is a Mechanical <br />Engineer on the renovations to accommodate the needs of the sheriff’s operations. <br />Renovations include the following: Add fire sprinkler system, replacement of the <br />main fire alarm panel, repair exterior windows, confirm fire rated separation <br />between Historic Courthouse and Annex, replace A/C ductwork, VAV units and <br />controls, provide a ducted return system, test and balance the new system, replace <br />all lighting with energy efficient fixtures and lighting controls, replace electrical <br />power distribution system, new communications data and technologies equipment, <br />renovate all restrooms to ADA standards, replace all suspended acoustical ceilings <br />and grid with new efficient acoustic values, replace all water heaters with energy <br />efficient units. <br />2010, Orange County Government Barnett Park Gymnasium, Orlando, FL – <br />Mr. Lizasoain was a Mechanical Engineer for the design of the new Barnett Park <br />gymnasium that connects to an existing building. A new chiller plant was designed <br />to provide cooling for the new and existing building. <br />2010, Orange County Fire & Rescue, Fire Station #35, Orlando, FL – Mr. <br />Lizasoain was the principal commissioning authority providing commissioning <br />services for LEED enhanced commissioning. SGM developed the owners OPR <br />documents, reviewed drawings during construction, developed the commissioning <br />plan, attended construction meetings, witnessed equipment start up, performed <br />functional performance tests on the equipment and provided Test & Balance <br />services. Commissioning procedures were performed following the ACG guidelines <br />and the requirements of LEED. <br />2010, Osceola County Sherriff’s Department Fleet Management Center, <br />Kissimmee, FL – Mr. Lizasoain was a Mechanical Engineer for this 32,000 SF <br />facility that was converted from an automobile dealership. Mr. Lizasoain’s design for <br />this project included upgrading of all HVAC equipment, lighting and receptacles in <br />offices, data outlets, replacement of plumbing fixtures, addition of loading dock, and <br />the addition of a vehicle fueling station. An emergency generator and distribution <br />system was designed and installed for all HVAC loads, office lighting and <br />receptacles, telecommunications equipment, multiple vehicle lift stations, and the <br />fueling station. <br />YEARS EXPERIENCE: 11 <br />With SGM since 2005 <br /> <br />EDUCATION <br />Master of Science, Mechanical <br />Engineering <br />George Washington University, <br />1999 <br /> <br />Bachelor of Science, Mechanical <br />Engineering <br />Polytechnic University of Puerto <br />Rico, 1997 <br /> <br />REGISTRATION <br />Registered Professional <br />Engineer – Florida #60785 <br /> <br />ACG Certified Commissioning <br />Authority <br /> <br /> <br />YEARS EXPERIENCE: 15 <br />With SGM since 2005 <br /> <br />EDUCATION <br />Master of Science, Mechanical <br />Engineering <br />George Washington University, <br />1999 <br /> <br />Bachelor of Science, Mechanical <br />Engineering <br />Polytechnic University of Puerto <br />Rico, 1997 <br /> <br />REGISTRATION <br />Registered Professional <br />Engineer – Florida #60785 <br /> <br />ACG Certified Commissioning <br />Authority (CxA)