Laserfiche WebLink
Songlith Sayprasith, P.E., CxA <br />Plumbing & Fire Protection Engineer <br /> <br /> <br /> <br />2010, Orange County Convention Center Orlando, FL - Mr. Sayprasith provided Plumbing & Fire Protection Design and <br />Commissioning of new Variable Frequency Drives and Controls for all existing air handling units, fan, blowers and <br />secondary chilled water pumps. SGM was the Engineer of the record and responsible for a solid commissioning plan for this <br />4,200,000 sq. ft. facility, the second largest convention center in the nation. The new plan was an alteration to existing <br />facilities HVAC system. As part of this project, SGM is currently upgrading and replacing the existing multi manufacturer <br />HVAC building automation systems (BAS) to the most current hardware and software using one manufacturer’s product. <br />This BAS will be integrated through an enterprise level portal with remote accessibility. The goal is to integrate the campus <br />wide buildings into one BAS web based access point.SGM is responsible for design of new controls, energy management <br />system in compliance with codes, development of specifications, sequence of controls, design and general construction <br />scheduling, cost estimating, and construction management. <br />2010, Orange County Medical Examiners Facility Orlando, FL – Mr. Sayprasith provided engineering services for <br />mechanical systems. Our fire protection submittal included complete sprinkler layout, specifications, and hydraulic <br />calculations. The plumbing drawings show required pipe routing and sizes supplying each plumbing fixture. In addition, <br />specifications were provided to show the required product materials, equipment, execution, and testing for all systems being <br />used. Our contract also included construction administration which required periodic site inspections, shop drawing review, <br />RFI responses, and meeting with the AHJ. <br />2010, Orlando Events Center Parking Garage, Orlando, FL –Mr. Sayprasith provided plumbing and fire protection <br />services for a $34 million parking structure to serve the needs of the Orlando Events Center (OEC). The multi-level, open <br />parking structure will feature an estimated 2,000 spaces free of column obstacles, a helicopter landing pad, a climate- <br />controlled elevated pedestrian crosswalk to the Orlando Events Center, and an energy-efficient lighting system. The <br />structure will have eight (8) elevated parking levels. All stall sizes with be a minimum of 9’ wide and 18’ deep. The project is <br />fast tracked for completion by July 2010. <br />2007, City of Titusville, Fire Command Center, Titusville, FL – Mr. Sayprasith was a plumbing and fire protection <br />engineer for the building assessment report regarding the MEP conditions of the City of Titusville’s Fire Command Center. <br />SGM determined and identified current issues for life safety, ADA, HVAC, IAQ and power/electric systems. SGM also <br />prepared cast estimates for associated deficiencies that were outlined in the report. The City utilized the report to request <br />funding based on the findings. <br />2007, Orange County Corrections Central Utility Plant Chiller Expansion, Orlando, FL – Mr. Sayprasith provided <br />plumbing & fire protection design services for the existing central chiller plant which was required to meet the campus HVAC <br />needs. <br />2007, City of New Port Richey Recreation and Aquatic Center, New Port Richey, FL – Mr. Sayprasith provided <br />plumbing and fire protection design services for the renovation of the thirty-seven year old existing recreation center and <br />addition of a new 37,000 SF complex with a gymnasium, locker rooms, fitness center and meeting rooms. Exterior lighting <br />was added for the outdoor tennis courts, parking lots, basketball courts, shuffleboard courts, and walking trails. <br />