My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez and Partners
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Wolfberg Alvarez and Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2012 4:58:51 PM
Creation date
6/11/2012 4:56:23 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
meetings will allow for quick response as needed <br />and the firm's staffing depth will ensure the avail- <br />ability of the resources to respond to multiple <br />schedule demands. <br />The commitment of the firm to provide professional <br />excellence and responsiveness for this project will <br />remain uncompromised while meeting established <br />schedules. The projected work load for our collec- <br />tive firms and staffing levels, combined with the <br />availability of an experienced team of professionals <br />in all disciplines will enable our team not only to <br />maintain continuing schedule control, but best sat- <br />isfy the total needs of this project. <br />Quality Control Methods <br />The firm utilizes quality control procedures that <br />achieve a fundamental coordination of architectural <br />and engineering disciplines in programming, plan- <br />ning, design, and construction. <br />The quality control program for this project will pro- <br />vide the expertise and direction required to execute <br />a successful program. This will include control of <br />information during the entire life of the project and in <br />the development of complete and coordinated docu- <br />mentation. In order to enhance the effort, and <br />thereby provide the highest level of professional <br />achievement, we will utilize an innovative approach <br />to quality control. <br />A quality control program will be instituted at the <br />onset of a project and an independent quality con- <br />trol professional (not involved in the day -to -day <br />design or development of the project) will be as- <br />signed. The quality control coordinator will carefully <br />review design and documentation at key milestones <br />and offer an unbiased and unencumbered review. <br />Similar to accepted value engineering procedures, <br />this quality control process will provide a viable, in- <br />dependent review and critique. This approach will <br />separate the review and coordination process from <br />the day -to -day execution of work and will, there- <br />fore, enhance the production of accurate, definitive <br />construction documents. <br />ARCHITECTURE <br />ENGINEERING <br />PLANNING <br />INTERIOR DESIGN <br />City of Sunny Isles Beach <br />Page 33 a 'a <br />As a commitment to the importance we place on <br />quality control for this project, Mr. Raul Estevez will <br />serve as the quality control coordinator. In addition, <br />a senior architect and senior engineer from the firm, <br />will act as architectural and engineering coordina- <br />tors and provides another level of quality control. <br />In closing, as one of the largest architecture and <br />engineering firms in South Florida, with an unri- <br />valed reputation for outstanding performance and <br />ability to deliver, WA, BNI and ORDA brings the <br />relevant experience, design creativity, organiza- <br />tion, resources and commitment to successfully <br />deliver your project on time. The firm has provided <br />comprehensive design services for numerous re- <br />lated projects, and thus we are uniquely posi- <br />tioned to successfully execute this project for the <br />City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.