Laserfiche WebLink
Engine ' I'lanncrs survey, <br />Hampton Inn at Brickell <br />Featured Project <br />Owner: Hospitality America <br />Location: Downtown Brickell, Miami <br />Project Description: <br />Hotel - Our Hampton Inn & Suites® Miami Brickell Downtown hotel <br />features 221 rooms & suites complete with signature GREEN features that <br />encompasses our reputation of eco- friendly hotel such as master - switch lights <br />control in all guestrooms, thermostat -based occupancy sensors, one -side tinted <br />windows to reduce heat of the hot Florida sun while showcasing amazing <br />views of Brickell's skyline. <br />Key Personnel: Clifford Loutan, P.E. was the Project Manager and Design Engineer for STE. <br />Contract: $60,000 <br />Change Orders: None <br />Final Cost: $16,000,000 <br />Contact: Howard Wolfson (305) 373 -0611 <br />��ia ^ice - <br />I:nFin�rr.. I'lannrr. tiny <br />City of Sunny Isles Beach <br />Continuing Professional Architectural & <br />Engineering Services Individuals Only (CCNA) <br />RFP NO. 12 -04 -01 <br />04 S,NNY t s`F�d <br />a <br />M ft <br />U <br />• Oaf <br />tiI CDy�. FLOP' v' <br />16 <br />