My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sun Tech
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-01) Professional Architectural and Engin. Svcs - Individulas Only CCNA
>
Responses
>
Sun Tech
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 11:43:43 AM
Creation date
6/12/2012 11:38:46 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs - Individuals
Bid No. (xx-xx-xx)
12-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staffing <br />Engineers Planners Surcepnrs <br />STE Team has the combined staff resources that can be dedicated to this contract to effectively fulfill the <br />requirements for issued task assignments. Clifford Loutan, P.E. the Project Manager, is the Director of <br />Engineering and shall be committed to the City for the duration of the contract. Charles Rossi, PLS is the <br />director of Surveying and will provide necessary survey information to support engineering design. STE <br />shall dedicate sufficient staff i.e., Design Engineers, CADD Operators and Field Representatives to support <br />the Project Manager on all assignments and shall ensure that these staff members are available at all times to <br />complete tasks in the most prompt and professional manner. <br />Like most firms and individuals in today's economy, workloads have decreased. STE will give this contract <br />top priority and, if selected, we will guarantee that work will be completed on time and within budget and to <br />the highest degree of professional standards <br />Sun -Tech Engineering (STE) is proud of our ability to fast track or expedite projects. Effective project <br />management and adherence to operational protocol by all personnel including sub - consultants will ensure that <br />projects are completed in the most efficient and expeditious manner. Management of personnel time, <br />performance and productivity combined with the great technological advancements in electronic data <br />management and transfer will enable the STE Team to fast -track any given task under this contract. <br />STE will maintain an active web site with a secure .FTP link for City staff and / or other consultants to <br />download and upload documents for prompt review and comments. Autodesk Design Review software will <br />be available to allow City staff and sub- consultants to view, print, measure, and mark up and revise 2D and <br />3D drawings without the original design- creation software. This allows a fully paperless review and approval <br />process. Once the drawing is reviewed electronically with Autodesk Design Review software, the drawing <br />can be uploaded back into the .FTP site with corrections and comments noted to enable immediate response <br />by the STE Team. Utilizing this software significantly reduces time for review and approval cycles and <br />reduces printing and shipping costs. STE currently utilizes this procedure with the Miami Dade Water and <br />Sewer Authority resulting in much quicker and more accurate turnaround. <br />City of Sunny Isles Beach <br />Continuing Professional Architectural & <br />Engineering Services Individuals Only (CCNA) <br />RFP NO. 12 -04 -01 <br />Ai <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.