My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sun Tech
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-01) Professional Architectural and Engin. Svcs - Individulas Only CCNA
>
Responses
>
Sun Tech
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 11:43:43 AM
Creation date
6/12/2012 11:38:46 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs - Individuals
Bid No. (xx-xx-xx)
12-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I "h <br />E.igineem Planners Saec" — <br />Approach /Methodology.r,...._. <br />Because the performance of most projects requires the efforts of more than one individual or team <br />member may be working on a project simultaneously over an extended period of time, Sun -Tech <br />Engineering (STE) adopts the team approach with the Project Manager directly responsible to the <br />Client for the performance of the firm. The team approach offers a degree of continuity, awareness <br />of the status of the project and a formal mechanism for the exchange of information and coordination <br />among team members whether they be in- house, client representatives or outside consultants. <br />The initial step for any project is the preparation of a preliminary performance schedule and project <br />management strategy. The performance schedule will identify all required steps and milestones <br />necessary to take the project from its current stage to completion. It allows the entire team to <br />understand the overall scheduling strategy necessary to accomplish all the tasks in the correct <br />sequence. In addition to the performance schedule, STE will implement the following project <br />management tools: <br />Setting up Project Guidelines <br />At the beginning of any project, STE works with Client to prepare Guidelines which is distributed to <br />the team. The Project Guidelines includes all Client requirements, all code requirements and design <br />approvals the project must follow by City, State and Federal jurisdictions. <br />Communication <br />It is critical at the start of the project to establish proper protocol and follow a "Chain of Command" <br />and point of contact for team members. Formats will be established for faxes, memos, phone <br />conversations and e- mails. <br />STE is proud of our ability to fast track or expedite projects. Effective project management and <br />adherence to operational protocol ensure that projects are completed in the most efficient and <br />expeditious manner. Management of personnel time, performance and productivity combined with <br />the great technological advancements in electronic data management and transfer enable STE to <br />expedite permitting and communication with other consultants or agencies. One of the most time <br />effective methods we utilize is a secure web site with a FTP link for City staff and/or other <br />consultants to download and upload documents for prompt review and comment. This process <br />allows others to view, print, measure, and mark up and revise 2D and 3D drawings. Utilizing this <br />technology significantly reduces time for review and approval, project coordination for other <br />disciplines, and is also eco- friendly by creating a fully paperless review and approval process which <br />eliminates /minimizes shipping costs. STE currently utilizes this procedure with the Miami Dade <br />Water and Sewer Department as well as many sub - consultants. <br />Team Directory <br />The Team Directory includes the entire design team and their role or responsibility, municipal <br />contacts and other participants that may be involved in the project. <br />City of Sunny Isles Beach <br />TECH Continuing Professional Architectural & <br />........... Engineering Services Individuals Only (CCNA) <br />RFP NO. 12 -04 -01 <br />u O� SVNNY l,{�Ffs = <br />ejrr or SuN 'Hu <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.