Laserfiche WebLink
Rose GNU�NCCItIN U. ANC. <br />4.0 Approach / Methodology F__..__ <br />Ross Engineering is to serve the City with one project manager, Robert Ross, P.E. Mr. Ross will serve <br />as the one point of contact for the engineering contract. As overall manager / facilitator, he will review <br />each task work order and coordinate closely with the appropriate task team member to accurately <br />define the scope, fee proposal and schedule. Throughout each task work order, Mr. Ross will routinely <br />review the progress being performed to ensure the project is on schedule, that proper agency <br />coordination is being done, and that the work product receives proper QA/QC from the Principal -in- <br />Charge before submittal. Melissa Ross will serve as Principal -in- Charge for each task work order and <br />ensure that every project stays on schedule and within budget. <br />Our approach is to be proactive and setup meetings with key City of Sunny Isles Beach staff including <br />scope negotiations, project kickoff, field meetings and when each deliverable milestone is met. We <br />want the City of Sunny Isles Beach to feel that Ross Engineering is an extension of their staff and not <br />an outside consultant performing work independently. We believe that strong communication and <br />coordination with the city will greatly benefit each task work order project and will ensure that the city's <br />money is well spent. One of the largest benefits with working with our firm is our desire to design <br />efficiently and employ value engineering concepts throughout the project in order to i� iii � ize <br />construction costs. The reason developers, contractors and land owners continue to re -hire our firm is <br />because we provide good design options that consider constructability and construction costs at the <br />same time. We will communicate and coordinate with assigned city staff from the very beginning to <br />very end of construction completion. <br />Prior to starting the contract, Ross Engineering will provide a sample of previous work that includes <br />project schedules, works orders and executive reports. The previous work would be similar project <br />types to the projects anticipated from the City. <br />For Drainage System Designs, Ross Engineering has extensive experience designing and permitting <br />projects with DERM for the 5 and 10 year storm events, depending on whether the street is a local <br />street or located on a section line. Ross Engineering staff have over 18 years of experience designing <br />exfiltration trenches, culverts, drainage injection wells (gravity and with pumps), stormwater pump <br />stations, ponds, canals, etc. Ross Engineering has strong experience in designing force mains and lift <br />stations for Miami -Dade County WASD, City of North Miami, City of North Miami Beach and many other <br />Miami -Dade county municipalities. Our force main design depends on the flow and pressure of the <br />upstream source, but most importantly our design includes looking at the downstream head, pressures <br />and flow on the existing lift stations and analyzing their pump size and float configurations. Lastly, our <br />resume for the planning and design of stormwater management looks at both water quantity and water <br />quality. We have performed stormwater master plans (SWMP) for cities, drainage districts and counties <br />including Miami -Dade County's DERM. We own an XP -SWMM license which is the software required to <br />run master plan analysis for all of DERM's stormwater basins including C -8 and C -9 basins in the <br />northern segment of the County. Some recent storm water master plans include the C -6 and C -1 basins <br />for DERM, SWMP(s) for City of Doral, Town of Immokalee, Central Broward Water Control District to <br />name a few. Our approach for stormwater in general is to obtain the very best data collection possible; <br />refine /upgrade or build a strong hydrologic and hydraulic model that can simulate impacts on flooding <br />and water quality; design improvements that can be simulated with H &H modeling to ensure positive <br />impacts on existing flooding and /or water quality conditions. <br />City of Sunny Isles Beach RF'Q 12 -04 -01 <br />Continuing Professional Architectural & Engineering Services Individuals Only (CCNA) 22 <br />