My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 11:29:21 AM
Creation date
6/14/2012 10:56:03 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs - Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OF 5Uµ Pr <br />Section 3 <br />Scope of Work / Technical Specifications <br />Pursuant to Florida Statutes, Chapter 287.055(2)(g) (Consultants Competitive Negotiations Act), the City <br />of Sunny Isles Beach, Florida invites qualified individuals and firms to submit Letters of Interest, <br />qualifications and experience of consideration to provide: <br />CONSTRUCTION MANAGEMENT SERVICES FOR GATEWAY PARK <br />The City intends to issue a single contract to provide professional services related to the development of <br />Gateway Park, located approximately at Collins Avenue (SR A1A) and Sunny Isles Boulevard (SR 826). <br />The project includes the construction of a parking garage with a capacity of more than 300 vehicles along <br />with public areas, landscaping and irrigation, and amphitheater. A contract between the City and a <br />design -build contractor has been executed with a contract valuation of $16.5 Million (Guaranteed <br />Maximum Price). <br />Construction Management Services to be provided includes but are not limited to: <br />• Thorough review of the design -build contractor's plans and other periodic or interim submittals <br />for conformance with the contract and City requirements. <br />• Advise the City on construction methods, materials, systems and structural components, <br />including materials that will provide economical operational and on -going maintenance costs. <br />• Perform value engineering and cost analysis on the base project and potential change orders. <br />• Participate in periodic and other meetings as needed or scheduled with the contractor, City and <br />other appropriate entities. <br />• Prepare and maintain complete project records that may include, among other items, <br />correspondence, emails, logs, inspection and other reports, Requests for Information (BFI's), <br />shop drawings, material or project samples, digital photographs or videos. <br />• Conduct on -site inspections at least 6 hours each construction day to insure compliance with <br />contract documents, applicable Codes and standard industry practice to insure the contractual <br />quality of the Project is maintained at all times. Perform substantial and final completion <br />inspections and prepare punchlist(s). <br />• Review the design -build contractor's monthly payment applications and make recommendations <br />to the City for payment. Subtasks may include review of the schedule of values, verifying <br />quantity calculations and taking field measurements. <br />• Prepare recommendations to the City regarding Work Change Directives, Amendments, Change <br />Orders, Extra Work and Field Orders. Identify and report any significant omissions, substitutions, <br />defects and deficiencies noted in the work of the Contractor and the corrective action that is <br />required. <br />City of Sunny Isles Beach I Request for Proposal No. 12 -06 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.