My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 11:29:21 AM
Creation date
6/14/2012 10:56:03 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs - Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'-"r OF SUS P"" <br />Closeout services including verifying all permits have been completed and closed out and the <br />project in its entirety can be placed in service. Verify that all lien releases are obtained, reconcile <br />design -build contractor's final payment application with as- builts and contract documents, make <br />recommendation final payment including release of retainage. Obtain for the City all as -built <br />drawings, warranties, operating manuals and maintenance agreements. Insure that any relevant <br />training on any portion or system of the project, as appropriate, has been completed. <br />END OF SECTON <br />City of Sunny Isles Beach I Request for Proposal No. 12 -06 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.