|
............................
<br />.............................
<br />Ms. Duffoo has 22 years performing infrastructure improvements in Florida and 15
<br />Relevant Highlights
<br />years dedicated to FDOT CEI services. Her engaging energy and strong understanding
<br />o Sr. Project Engineer with Target
<br />of project requirements give her a patent presence in the field. From Contractor
<br />Engineering Group
<br />negotiations to staff training there is no question she has the best interests of the
<br />22 years serving FDOT inCEl role
<br />on Florida Roadways
<br />Department in mind. Ms. Duffoo's tool -box is full of hands on experience, diligent study
<br />• Part of FDOT Task Team to
<br />of all current specifications including federal state and local guidelines, The value of the
<br />streamline asphalt record
<br />condensed experience gained from her 7 residency assignments shows in
<br />p g Y 9
<br />:procedures, D4 - 2004 2007
<br />understanding of Department needs and expertise in analyzing CPM schedules and
<br />Part of FDOT Task Team to for
<br />Contactor claims. She complements strong field leadership with a full suite of software:
<br />Materials Certification Process D4
<br />Primavera, CADD, Site Manager, LIMS, CQR, Hummingbird, EngineerMenu and
<br />:and State Materials 2003 -2005
<br />Microsoft Office. She has received several FDOT recognition awards for her
<br />• Since 1994 have been involved with
<br />performance. Her cataloguing and analysis overrun/ underrun data revealed findings
<br />hundreds of final estimates and
<br />that earned the DCE the Davis Productivity Award for District 6.
<br />close out packages
<br />Education
<br />Relevant Experience
<br />Bachelor of Science in Civil
<br />1112 — Present, Senior Project Engineer. District IV. FIN 419015.1.52 -01: 17 Street
<br />Environmental Engineering, Florida
<br />Causeway Bascule Bridge Rehabilitation; FIN: 423000- 1- 52 -01: SR A1A from
<br />International University 1985
<br />Flamingo to Oakland Park; FIN 423004 - 1.52.01: SR 84 from MP 16 to SW 26 Terr.;
<br />FIN 423007 - 1.52 -01: A1A117 St. from Cordova Rd to Eisenhower Blvd, Broward
<br />Registrations /Certifications
<br />County, Florida. Total Project(s) combined duration 270 days and a combined
<br />PE/ FL #6.7055/2007
<br />construction cost of $ 5,993,540.48. Sr. Project Engineer for four projects running
<br />PE/LA #33207/2007 ::........::......::
<br />consecutively. Three of these projects essentially consist of drainage, milling,
<br />PE/TX: #105739
<br />LEED Certification
<br />resurfacing, signalization, sidewalk improvements, landscape, signing and pavement
<br />TIN :# 602 0
<br />marking. The fourth project consists of rehabilitation and replacement of bascule bridge
<br />Professional Of the Year 2011 by
<br />inal f the
<br />elements such as handrail, replacement of lighting, replacement of concrete barrier wall
<br />National Society of Professional Women
<br />to the west bound movable span, painting and pressure cleaning. Duties include, field
<br />supervision, contract administration, performing contractor's performance rating, field
<br />CTQP Earthwork Level l & li '
<br />conflict resolution. All of these projects have different contracts, different contractors,
<br />CTQP Final Estimates Levels l & II
<br />different Designers thus requiring an Engineer capable of Multi- Tasking. Reference
<br />CTQP Asphalt Level 1 & II
<br />Contact: Hewrald "Hew" Humes, E.I., (954) 776 -4300.
<br />CTQP QC Manager
<br />CTQP.Concrete Field Tech 1
<br />8/11 — Project Present, Project Manager. City of Miami Neighborhood
<br />CTQP Drill Shaft
<br />ACI Concrete Tech Level 1
<br />Improvements, Miami -Dade County, Florida. Concurrent with the project above,
<br />NPDES DEC Qualified Storm Inspector :
<br />Mrs. Duffoo is administering a City contract funded through Local Agency Projects
<br />Consultant CEI Project Manager
<br />LAP for the City f Miami. Duties include maintaining the necessary
<br />(LAP) Y 9 inspection
<br />Training
<br />personnel and providing support to the City Project Manager during construction. In
<br />Geopak and Multi4ine Training
<br />addition to this Mrs. Duffoo serves as a Liaison between the Department of
<br />MOT Advanced
<br />Transportation (District Six) and the City of Miami Project Manager in managing the
<br />Troxler Nuclear Safety
<br />documentation to satisfy LAP contract requirements. Reference Contact: Valentine
<br />CSX Contractor Safety 08 -2138
<br />Onuigbo, P.E. (305) 416 -2588, Barbara Espino Perez (305) 640 -7405.
<br />Critical Structures Construction Issues-
<br />Self Study
<br />2110 — 12111. Sr. Project Engineer District IV. FIN 416876 -1 -52.01 SR7 (US441)
<br />IS 1:OOb- FEMA Instruction to Incident
<br />Orange to 1 -595; FIN 416877- 1 -52 -01 SR 7 (US 441) from Bailey Rd to Blvd of
<br />Command System
<br />IS 200b — FEMA Initial Action Incident
<br />Champions; FIN 416878.1.52 -01 SR 7 (US 441) from Cypress Canal to Sample Rd,
<br />IS700a -- FEMA National incident
<br />groward County, Florida. Total Project(s) combined duration 400 days and a
<br />management System (NIMS)
<br />combined construction cost of $ 6,215,329. Sr. Project Engineer for three projects
<br />IS800b — FEMA National Response
<br />running consecutively along the same corridor. Duties include, field supervision,
<br />Framework
<br />contract administration, preparation of estimates, performing contractor's performance
<br />PTI Post Tensioning 1 (Scheduled 6/12)
<br />rating, field conflict resolution, for all three FDOT projects consisting of milling,
<br />T =G
<br />.......
<br />TARGET ENGINEERING GROUP, INC.
<br />
|