Sara Duffoo, P.E., LEED AP
<br />Page 2
<br />..............
<br />resurfacing, signalization drainage. These three projects have different contractors, different Designers thus it requires an
<br />Engineer capable of Multi- Tasking. Reference Contact: Eghbal "Jay" Jalali, (954) 776 -4300, Maria Connolly, P.E. (954) 486 -1400.
<br />5/08 — 2/09. Sr. Project Engineer. District IV FIN: 228075.1 -52.01 SR845 (Powerline Rd) from Cypress Creek Rd to Atlantic
<br />Blvd. FIN 416242.1.52.01 SR 825 (US27), Broward County, Florida. Two projects running consecutively. Total Duration: 365
<br />days for a combined cost of $15,000,000. Duties include, field supervision, contract administration, preparation of estimates,
<br />performing contractor's performance rating, field conflict resolution, for the two FDOT projects consisting of milling, resurfacing,
<br />i signalization drainage. The latter project was a Lump Sum Contract along a 20 -mile corridor within a highly environmentally
<br />sensitive area. Reference Contact: Eghbal "Jay" Jalali, (954) 776 -4300, Rudi Batz, P.E. (954) 776 -4300.
<br />4/07 — 5/08. Sr. Project Engineer. Dsitrict IV. FIN 403577 - 1.52 -01 SR 814 /Atlantic Boulevard from SW 27th Avenue to
<br />Railroad Crossing, Pompano Beach, Florida. Sr. Project Engineer performing field supervision, contract administration,
<br />preparation of estimates, contractor's performance rating, field conflict resolution, milling, resurfacing, signalization drainage, and
<br />upgrading access management issues. This project included coordination of construction operations within CSX railroad
<br />r jurisdiction. Contact: James Jeffers, PE (954) 444 -5318, Rudi Batz, PE (954) 931 -6175.
<br />f
<br />7/04 — 4/07. Project Administrator /Sr. Project Engineer. District IV. FIN 228110- 1 -52 -01 SR 845 /Powerline Road from SR
<br />t 814 to SR 836, and FIN: 228157- 1 -52 -01 Oakland Park Boulevard from University Drive to Florida's Turnpike, Broward
<br />County, Florida. For these separate contracts, Ms. Duffoo was Project Administrator performing field supervision, contract
<br />administration, estimates preparation, rating contractor's performance, resolving field conflict, and preparing final estimates for
<br />i milling, resurfacing, signalization drainage, concrete pavement, bride widening, and upgrading 9 9 p9 g access management. The SR -845
<br />contract was designated as a Materials Model Project. The latter was assigned as a pilot project that tested a new mix design with
<br />a sand component in conjunction with the State Materials Office. Oakland Park Blvd project included a bridge widening. Contact:
<br />Jesus Caballero PE, (954) 677 -7014, Sabrina Aubery (954) 486 -1400.
<br />9/04 - 9/05, Hurricane Monitoring Services District VI: In charge of administering, coordinating, setting up all Hurricane Debris
<br />and Utility Restoration in Miami -Dade County. Duties included setting up a data base and logistics for all hurricane contractors
<br />working in the area. Contact: Mary Lou Kamer (305) 256 -6374.
<br />11/01 - 7/04, CEI Services, Ft. Lauderdale Operations Center, District IV, Fort Lauderdale, Florida. Project Administrator
<br />assigned to several Fort Lauderdale Operation Center She also served as Resident QA/QC Coordinator for Fort Lauderdale
<br />Residency; conducting QA/QC review and training. Notable projects are listed below. Contact: James Jeffers, PE, (954) 444 -5318.
<br />j Complex and time sensitive drainage project for the subaqueous installation of flap gate on AIA from Iris Terrace to
<br />iJ Madison St. in Hollywood.
<br />■ Sunrise Blvd, from Intracoastal Waterway to Middle River roadway widening, milling, and resurfacing, drainage,
<br />landscaping and lighting FTBA Award recipient.
<br />■ Project Administrator for (US441) from Commercial Blvd to Prospect Road.
<br />■ Office Engineer /Project Administrator $20M Griffin Rd. close out/materials certification.
<br />8/98 - 11/01, FDOT District IV Residency, Fort Lauderdale, Florida. Project Engineer responsibilities include field supervision,
<br />to ensure compliance with contract documents, processing work orders, supplemental agreements and pay estimates; preparing
<br />the documents for final estimates; reviewing and updating construction schedules; analysis and preparation of claims
<br />documentation; and assisting field staff with inspection, testing and materials sampling. Contact: James Jeffers, PE and Rudi Batz,
<br />PE (954) 776 -4300.
<br />4/98 - 7/98, FDOT District IV General Assigned CEI Services Contract, Ft. Lauderdale, Florida. Final Estimates Engineer at
<br />FDOT District Four Ft. Lauderdale Construction Office responsible for reviewing and preparing final estimates documents for CEI
<br />and in -house projects. She was also tasked with training final estimates new - hires. Contact: Jennifer Olson, PE (954) 969 -3539.
<br />►� 1197 - 4198, FDOT District VI Miscellaneous CEI Services Contract. Resided at Construction Office performing Office Engineer
<br />duties on several projects. Responsibilities include review of construction SA tracking coding and reporting to Florida
<br />Transportation Commission. She assisted District Six Consultant CEI Engineer in the implementation of a backlog system for the
<br />_G _
<br />TARGET ENGINEERING GROUP, INC.