Laserfiche WebLink
Sara Duffoo, P.E., LEED AP <br />Page 3 <br />tracking reports and project personnel man -hour tracking log. She spent months in an FDOT warehouse cataloguing archived data <br />to quantify overrun and underrun statistics for the District. Trending revealed inefficiencies resolved by in -depth training of Project <br />Engineer Trainees. Once data was brought current, any project in the district could be compared with those past for comparative <br />budget analysis. Tracking lead to significant efficiencies throughout the District which earned the DCE the Davis <br />Productivity Award. Contact: Ronnie Klein, PE (305) 499 -2363. <br />r� 7195 - 12196, FDOT District IV General Assigned CEI Services Contract, Ft. Lauderdale, Florida. Performed as Office /Final <br />Estimates Engineer in the Construction office. Served as Interim Resident Final Estimates Engineer reviewing, preparing Final <br />Estimates documents for CEI and in -house projects. Contact: Jennifer Olson, PE (954) 969 -3539. <br />10/95 - 6196, US -1 HOV -Bus Lanes Project, FDOT District VI, Miami, Florida. Office Engineer responsible for six projects, three <br />contracts with three separate contractors, She prepared supplemental agreements, work orders, schedule update review, pay <br />estimates, quality adjustments, construction quality reporting (CQR) and documents for Final Estimates. <br />2/94 - 10/95, Districtwide CEI Services Contract, District VI Construction Office, Miami, Florida. As Office Engineer she <br />assisted the District Six Final Estimates Staff in reviewing and preparing Final Estimates. Other responsibilities included <br />implementation, training and technical support of the FDOT Engineering Menu Program. Assisted in the implementation of District <br />Six final estimates digitizing program for earthwork items. <br />1193 - 1/94, Miami Dade Water and Sewer Department North District Wastewater Transmission System Miami, Florida. <br />Design Project Engineer /Project Manager for design, construction administration, preparation of technical specifications, and <br />project management for the City of South Miami, SW 59th Avenue improvements. City of West Miami existing 20th Street Lift <br />Station Operational assessment and project management and CEI for the State of Florida Department of Corrections, new prison <br />facilities (Everglades Correctional and Hawk Missile Site State Prison). <br />8/85 - 8/92, Project Engineer /Project Manager, Miami, Florida. Design, supervision, inspection, contract administration, <br />f construction inspection, coordination and preparation of technical specifications of water, sewer, paving & drainage plans. <br />i Responsible for preparation and computation of tentative and final plats for land subdivision /development. Duties included field <br />i <br />surveying as instrument person assistant party chief, writing legal description and geometric layout design. In charge of training <br />new engineering personnel, software implementation, training and maintenance of AutoCAD and Digicad Systems. <br />i� <br />LJ <br />T =G <br />TARGET ENGINEERING GROUP, INC. <br />