Renato Jacob, P.E.
<br />r CEI Project Administrator /Contract Support Specialist
<br />i _ _
<br />Relevant Highlights Professional Summary
<br />• : Project Administrator with Target Mr. Jacob has combined experience as a Project Engineer, Office Engineer and
<br />Engineering Group, Inc. Inspector on various Florida Department of Transportation projects. He is
<br />.: 20 years civil engineering knowledgeable in construction materials and construction techniques. He also has
<br />.::experience in public infrastructure. experience with post- tensioning and all phases of bridge construction from substructure
<br />sector::;:;:;.; to superstructure, both over land and water, He has worked on bascule bridges as well
<br />4
<br />22 years FDO. T Experience as AASHTO and steel girder bridges.
<br />Relevant Experience
<br />Education 2/12 — Present, SR -A1A Grouping, FDOT District IV, Broward County, Florida.
<br />BA/1990 /Computer Programmer Project Engineer Assistant/Contract Support Specialist. Responsible for assisting the
<br />r, A.S.T. /National School of Technology Project Engineer with the administration of four (4) separate contracts along SR -A1A at
<br />J)
<br />J
<br />different locations. Projects consist of bridge rehabilitation, milling and resurfacing, ADA
<br />BS /1982 /Civil Engineering/ Manuel L.
<br />and sidewalk updates, signalization, lighting, drainage, landscaping, signing and
<br />Quezon University, Manila, Philippines
<br />pavement marking. Among Mr. Jacobs' responsibilities are processing estimates,
<br />Registrations /Certifications
<br />reviewing contractors' documents for approval, administering inspection needs,
<br />PE /FL /Registration #49017
<br />attributing documents in EDMS. Project Manager: Hewrald "Hew" Humes, E.I. (954)
<br />940 -7505.
<br />TIN #J210721570810
<br />2/10 — 1/12, SR -7(US -441), FDOT District IV, Broward County, Florida. Project
<br />CTQP Asphalt Paving Technician I & 11
<br />Engineer Assistant/Contract Support Specialist. Responsible for assisting the Project
<br />CTQP Earthwork Construction I & II
<br />Engineer with the administration of three (3) separate contracts along SR 7 at different
<br />CTQP Final Estimates I & II
<br />locations. Projects consist of milling and resurfacing, signalization, lighting, drainage,
<br />QC Manager
<br />landscaping, signing and pavement marking. Among Mr. Jacobs' responsibilities are
<br />Qualified Stormwater Management
<br />processing estimates, reviewing contractors' documents for approval, administering
<br />Inspectors
<br />inspection needs, attributing documents in EDMS• Project Manager: Ehgbal "Jay" Jalali
<br />Florida Advanced Training by ATSSA
<br />(954)776 -4300.
<br />Troxler /Radiation Safety and Use of
<br />Nuclear Gauge
<br />ACI /Concrete Field Testing Technician
<br />10/05 — 1/10, Project Administrator, Turnpike Widening from Sunrise Blvd. to
<br />Grade I
<br />Atlantic Blvd., Florida's Turnpike Enterprise, Florida. Project consists of the
<br />p p � 1
<br />FDOT (District 4) Site Manager
<br />widening of six miles of the Florida Turnpike to provide four lanes in the Southbound
<br />FDOT (District 4) Laboratory
<br />direction. Work includes roadway and bridge widening, reconstruction of two bridges,
<br />Information and Management System
<br />drainage improvements, overhead signing, noise walls, high mast lighting, landscaping
<br />(LIMS)
<br />.............
<br />..................
<br />and toll plaza improvements.
<br />............................
<br />......................
<br />............................
<br />Mr. Jacob is responsible for ensuring facility is constructed as per plans and
<br />specifications. Responsibilities also include construction inspection, sampling and
<br />testing of materials, and supervision of project documentation, involvement in resolution
<br />of construction conflicts, which includes field changes, negotiating, estimating, and
<br />analysis of construction claims and change orders. Also reviews contractor submittals
<br />including schedules, shop drawings, construction methods, installation plans, and traffic
<br />control plans. Turnpike Project Manager: Pacifico Castillo; (954) 975 -4855 Ext. 1134.
<br />:
<br />7/02 — 9/05, Assistant Project Administrator, Royal Park Bridge Replacement,
<br />FDOT District IV, Palm Beach County, Florida. The new facility consists of a pair of
<br />parallel trunnion bascule bridges constructed in one phase. Afour -lane temporary
<br />bridge was utilized for construction staging. The structure for the bascule span includes
<br />a superstructure of steel plate girders with a composite exothermic deck and a
<br />T=G
<br />TARGET ENGINEERING GROUP, INC.