My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Target Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Target Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 11:46:34 AM
Creation date
6/14/2012 11:36:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"1 <br />f To Whom it May Concern <br />r� <br />Subject: Reference Letter for the Proposer <br />Name of Proposer: Target Engineering Group, Inc <br />r Name of Project: PIN 416878- 1 -52 -01 S.R. 7 (US 441) from Cypress Canal to Sample Rd <br />i <br />Scope of work: Roadway reconstruction, milling, resurfacing, signalization, lighting, landscaping <br />Value of project: $ $4,466,355 <br />Delivery method: 0 Request for Proposals El Request for Qualifications © Other Q&A Session <br />Did Consultant provide Program Administration services ❑ Yes X No ❑ limited scope <br />Did Consultant provide Production Management services ❑ Yes ❑ No ® limited scope <br />Did Consultant provide Construction Administration services © Yes ❑ No []limited scope <br />L What Specialty Services did the Consultant Perform: <br />Were there any increases to the original Agreement? ❑ Yes no No <br />If yes, please explain: <br />r l Duration Time of the Project: 500 days <br />Quality of Services: ❑ Above expectations ❑ Average ❑ Below Expectations <br />Comments: <br />L The department has enclosed the last grade for this project. For future the Department will only include the <br />the last grade for the project. <br />I I Eghbal "Jay" Jalaii Name of individual completing this fo Date: <br />i <br />Signature: i Title: Construction Project Manager <br />r <br />IL <br />Telephone: (9 ) 776 -4300 E -mail: eghbal.jalali @dot.state.fl.us <br />Sincerely, <br />i Albert Sosa, P.E. <br />Director <br />I� <br />l� RFQ -PP -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.