My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Target Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Target Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 11:46:34 AM
Creation date
6/14/2012 11:36:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />l� <br />Target Engineering C8X09 TOW 10 1 Interval.txt <br />+CONSULTANT PERFORMANCE GRADES: MAIN DATABASE SCREEN ----------------- Obs 33278 -+ <br />1 Command == => I <br />I Project Grades File has been successfully Updated I <br />I Contract # : c8x09 Financial Management #: 41687616201 District: 4 I <br />I Description: SR -7 /u5 -441 CEI SERVICES Grade Date: 19DEC2011 <br />I Project Mgr: Grade Type: Interval <br />Consultant TARGET ENGINEERING GROUP, INC. Graded As : PRIME <br />work Type 10.1 Rdwy Construction Engineering Inspection <br />Quality 4.0 <br />schedule 4.0 <br />Management 4.0 <br />Average 4.0 <br />Grade Note <br />Administrative Approval: <br />Grade Entered By LONGWORTH,JENNIE <br />Prof. Svcs. Review RUBIO, JESSICA <br />Update Gradesfile: (1 =Yes 0 =No) <br />Approved By: CABALLERO, EDUARDO <br />2 Date: 20DEC2011 <br />I PF1 =Help PF3 =End PF4 =Cancel PF7 =Back PF8= Forward <View Ques /Resp> I <br />+-------------------------------------------------------------------------- - - - - -+ <br />+CONSULTANT CEI(CCEI) WORK PERFORMANCE EVALUATION ----------- Obs 8917 <br />1 Command = = => <br />Screen 1 -+ <br />PF1 =Help PF3= process /Exit PF7 =Page Back PF8 =Page Forward PF12 =Cmd. Line <br />I Quarterly or semi - Annual Period Ending <br />I _ February _ May _ August x November _ End of contract _ other <br />Year CCEI Contract Type <br />2010 X Conventional — Hybrid _ Task Driven <br />CEI #: CBX09 Financial Mgt. #: 41687616201 work Type: 10.1 <br />Desc : SR -7 /US -441 CEI SERVICES District : 4 <br />Consultant Name : TARGET ENGINEERING GROUP, INC. GradedAS: PRIME <br />FDOT Project Mgr : HARRIS, JEANNETTE <br />Sr. Proj Engineer : <br />Proj Administrator: <br />Construction Contract $ <br />Const. Proj. Mgr: _ CPM Tel .# <br />Average score for ALL Qualitative criteria: 4.0 <br />(Note: An overall score of 3 is considered satisfactory performance) <br />+------------------------------------------------------------------------- - - - - -+ <br />+CONSULTANT CEI(CCEI) WORK PERFORMANCE EVALUATION ----------- Obs 8917 Screen 2 -+ <br />Command = = => I <br />PF1 =Help PF3 = Process /Exit PF7 =Page Back PF8 =Page Forward PF12 =Cmd. Line I <br />1 1 2 PERFORMANCE RATING SCALE 4 5 page 2 I <br />i <br />I sorely Lacking sometime misses Meets standard sometimes exceeds sets the I <br />I would NOT the mark. Does Does a good job standard /Shows standard/ I <br />I recommend well enough to some extra effort Exemplary I <br />get by. performance I <br />An overall score of 3 is considered satisfactory performance S= maximum score <br />Grade Entered By LONGWORTH,JENNIE <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.