Laserfiche WebLink
k <br />, 4 <br />Target En ineering C8x09 TOW 10 1 Interval.txt <br />Date Grade Assigned: 19DEC2011 (Format:DDMonYYYY 01MAY2004= May 01, 2004) <br />QUALITATIVE CRITERIA <br />(beginning next page) <br />+------------------------------------------------ - - - - -_ ------------------ - - ---t <br />+CONSULTANT CEI(CCEI) WORK PERFORMANCE EVALUATION ----------- Obs 8917 screen 3 -+ <br />Command = = => I <br />PF1 =Help PF3 =Process /Exit PF7 =Pa9e Back PF8 =Page Forward PF12 =Cmd. Line <br />j A. Management of CCEI Contract(weight =0.09) page 3 <br />I 1. Continuously provided CTQP qualified experienced staff as <br />I proposed; was responsive to Department's staffing requests; <br />I if personnel changes occurred, reasonable efforts were made <br />I so that the credentials of replacement staff were equal to or <br />j exceeded the qualifications of the person(s) originally approved. <br />2. Coordinated with department personnel to ensure effective <br />I contract management, with required submittals made timely, in the <br />subscribed format, with no material errors. Userids requested <br />promptly and access maintained; timesheets signed weekly, if <br />required; properly documented invoices submitted monthly; sub - <br />consultants paid promptly; contract funds were tracked & reported <br />as requested to avoid rush amendments; out -of -fund conditions, or <br />settlement agreements. <br />3. Communicated regularly with Department CPM or pro ect <br />administrator and performed QC /QA inspection of staP on longer <br />assignments to ensure the Department needs were being met. <br />4. utilized CEI personal protective equipment at all times as <br />required. <br />4 <br />4 <br />4 <br />4 <br />+------------------------------------------------------------------------- - - - - -t <br />+CONSULTANT CEI(CCEI) WORK PERFORMANCE EVALUATION ----------- Obs 8917 screen 4 -+ <br />Command = = => I <br />I PF1 =Help PF3 = Process /Exit PF7 =Page Back PF8 =Page Forward PF12 =Cmd. Line <br />Management of CCEI Contract (continued) page 4 j <br />S. Compliance with agreed upon DBE /MBE utilization goals and <br />procedures. <br />j For Task Driven Contracts(Districtwide, On -call, GEC type): <br />6. Responded by the Department deadline whether a task request <br />was accepted. If accepted, promptly developed an understanding <br />of the assignment; prepared and submitted an accurate request <br />package, and dispatched approved, properly equipped personnel <br />when needed, but not prior to receiving authorization. <br />Management Total <br />Notes: <br />4 <br />20 / Number of Tests 5 x0.09 = Management GRADE: 0.36 <br />+------------------------------------------------------------------------- - - - - -t <br />+CONSULTANT CEI(CCEI) WORK PERFORMANCE EVALUATION ----------- Obs 8917 Screen 5 -+ <br />Page 2 <br />,l <br />J <br />I <br />IJ <br />