My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 12:02:34 PM
Creation date
6/14/2012 11:51:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />JOEL T. WADSWORTH, GC <br />Project Manager <br />SUMMARY OF QUALIFICATIONS <br />Joel Wadsworth is an accomplished strategic planner, leader, and construction/facility <br />management specialist with more than 25 years of experience serving an instrumental <br />role in the delivery of top quality, multimillion‐dollar real estate developments. He held <br />positions as estimator/purchasing agent, assistant superintendent, superintendent, <br />project manager and VP Director of Construction for Trafalgar Developers/Associates, <br />Inc. a subsidiary of General Electric Company. He held similar high‐level positions with <br />the HDC Group and International Sales Group assuming responsibilities and authority <br />for the budgeting, contracting and construction management of a number of complex <br />high‐end residential and commercial real estate developments. <br />PROJECT EXPERIENCE <br />Project Manager – Construction Services Division Calvin, Giordano, & Associates, <br />Inc. Ft. Lauderdale, Florida: Capital Projects Manager – City of Sunny Isles Beach, FL: <br />Key Construction Projects: <br /> $14m Parking Garage & Park <br /> $5.5m Ocean Fishing Pier <br /> $3.5m Intracoastal Bridge <br />Project Manager – City of Sunny Isles Beach: Heritage Park & Garage (May 2010 – <br />June 2011). Project is a 380 space, cast‐in‐place concrete garage with decorative metal <br />panel skin and accompanied by a 3‐acre City park. The Park amenities include a <br />performance stage, commemorative wall and fountain, an interactive water feature with <br />two children’s playground areas, an observation Pavilion, an expansive lawn area and <br />lush landscaping. Work completed June 2011 at a cost of $14,000,000.00. <br />Project Manager – City of Sunny Isles Beach: Town Center Skatepark (June 2010 – <br />February 2011. Project is a 7500sf concrete park on a one‐acre parcel of an existing <br />City park. This Design‐Build project consisted of coordinating the design team and the <br />General Contractor to complete the cast‐in‐place complex concrete features <br />incorporated in the state‐of‐the‐art facility designed for world‐class skateboard <br />professionals. Challenges met include working a tight site with limited accessibility <br />while maintaining safe access to the existing facilities. Work completed on schedule in <br />February 2011 at a cost of $600,000.00. <br />Project Manager – City of Sunny Isles Beach: Newport Fishing Pier & Restaurant: <br />The City of Sunny Isles contracted CGA to provide engineering and government <br />consulting services for the Sunny Isles Beach Newport Fishing Pier project. The City <br />entered into a public‐private partnership to restore the Newport Fishing Pier, which <br />was badly damaged during Hurricane Wilma in 2005. The Pier, which is the last <br />remaining public pier in Miami‐Dade County, was built in 1936.The 800’ pier was <br />designated as a historic site in 1982. The project involves project management services <br />throughout the permitting, demolition and reconstruction phases of the project as well <br />as Prime consultant duties involving the retention and management of Special <br />Inspectors, Geotechnical Engineer of Record and Materials Testing Services. The project <br />is set to be permitted by late October 2011 and will include a 105‐seat restaurant, 2nd <br />story lifeguard office and fishing stations. The project is scheduled to commence <br />construction in November 2011 with a completion date of June 2012. <br />EDUCATION <br />Bachelor of Arts in Building <br />Construction, University of <br />Florida, Gainesville, Florida <br />CERTIFICATIONS <br />Certified General Contractor <br />(Active License) <br />#CGC009211 <br />Page 3| 6
The URL can be used to link to this page
Your browser does not support the video tag.