My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 12:02:34 PM
Creation date
6/14/2012 11:51:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Jonathan N. Cooper, PE, Page 3 <br />Florida Power and Light (FPL) SubStation Expansions, Florida. Project Manager for civil engineering <br />design of drainage systems associated with electrical sub‐station expansions including on‐site retention or <br />discharge, water quality treatment, environmental permitting as well as potable water and sanitary sewer <br />services. <br />Walter C. Young Middle School and Resource Center, Pembroke Pines, Florida. Project engineer <br />coordinating design and layout of large public school complex with considerations for existing drainage, <br />water, sewer, and other utilities. Evaluated numerous concepts for most economical and efficient means to <br />improve level of service. <br />FDOT District 6, Tamiami Trail ReSurfacing, MiamiDade County, Florida; Project manager for this <br />32 mile overlay project including milling and resurfacing as well as environmental improvements to <br />existing water quality pre‐treatment facilities through environ mental permitting. <br />WATER AND SEWER DESIGN EXPERIENCE <br />North Shore Improvement Program, Miami Beach. Quality control manager for design services and <br />construction documents for 4,555 linear feet of water mains, service laterals, fire hydrants, milling, and <br />paving. <br />Capital Improvement Program, Town of Surfside, Florida. Quality control manager for Implementation <br />of capital improvement plan, including cleaning, videotaping and restoration for the city‐wide sewer <br />system, replacement of potable water mains, refurbishment of sanitary sewer pump stations and <br />installation of pressurized drainage well systems for improved flooding level of service. <br />Cargo Apron for Miami International Airport, Miami, Florida. Project Manager for this multi‐discipline <br />team project in creation of cargo bay expansions which required a massive relocation of the utility corridor <br />containing domestic water, fire demand water, force mains, electric, communications, and other critical <br />lines. <br />Page 3| 5
The URL can be used to link to this page
Your browser does not support the video tag.