Laserfiche WebLink
<br />Chris Giordano, SMC, Page 2  <br />Projects Managed:  <br /> Waterside Improvements, Labadee, Haiti  <br /> USACE Blount Island Emergency Dredging  <br /> TPA FY 08 Maintenance Dredging  <br />Contract Manager / IT Director; Subaqueous Services, Inc., Orlando, FL. (2005 – 2008)  <br /> Managed Office Staff of Ten Employees  <br /> Maintained all Correspondence with Owners/Engineers  <br /> Managed $44 Million In Annual Contract Backlog  <br /> Created and Attended all Presentations for Governments, Citizens, Conferences and Private Firms  <br /> Created Project Tracking Databases  <br /> Maintained LAN with 15 Workstations 10 Remote Laptops and 2 Servers  <br />Projects Managed:  <br /> Volusia County Emergency Dune Restoration  <br /> Tampa Port Authority Hookers Point Expansion  <br /> Jaxport Dames Point Expansion‐Project One  <br /> SFWMD Lake Trafford Restoration‐Phase II  <br /> FIND MSA 434/434C DMMA Construction  <br /> Island Pointe Marina Dredging  <br /> Bayou Grande Villas Maintenance Dredging  <br /> Port Everglades Maintenance Dredging  <br /> Panama City Marina and Homeowner Canal Dredging  <br /> Peace River Hurricane Debris Cleanup  <br /> FP&L Hurricane Debris Cleanup  <br /> Hendry County Oxbow Dredging  <br /> SFWMD S‐65A Rock Rip Rap Bank Restoration  <br />Marketing Director / IT Director, Subaqueous Services, Inc., Orlando, FL. (2001 – 2002)  <br /> Prepared Official Bid Packages  <br /> Updated & Maintained Access Databases  <br /> Tracked Market Leads  <br /> Created Marketing Letters to Homeowners & Clients  <br /> Maintained LAN with 10 Workstations and 1 Server  <br />Engineering Inspector Intern, GLC Construction, Hallandale, FL. (1999 – 2001)  <br /> Air Tested Concrete  <br /> Slump Tested Concrete  <br /> Inspected Pollution Retard Baffles  <br /> Inspected Mud Work on Drainage Structures  <br />Page 3| 9