Laserfiche WebLink
<br />RODERICK MYRICK, PE, GC  <br />Construction Program Management  <br />SUMMARY OF QUALIFICATIONS   <br />Mr. Myrick has 15+ years of transportation design‐build, construction and emergency  <br />response management experience in varying roles, his latest as responsible for business  <br />development and the management of a construction engineering and inspection  <br />division.  He has demonstrated his diverse skills in several areas and is willing to make  <br />the tough management or technical decisions that are in the best interest of the client  <br />and his firm. Mr. Myrick has excellent communication and technical skills and will add  <br />immeasurable value to any project or team.   <br />PROJECT EXPERIENCE  <br />Project Engineer­ SR 90, US 41 Milling and Resurfacing, (12/2010 – 8/2011): The  <br />project scope includes millings and resurfacing of a 4 mile stretch of US 41 in Collier  <br />County. This is a rural construction project which includes bridge traffic railing  <br />modifications, shoulder rework, asphalt, signalization, signing and pavement markings  <br />and guardrail retrofits.  Roderick is currently managing 3 project concurrently on this  <br />assigned, an additional mill and resurface project and a design build urban ADA  <br />compliance project in the City of Naples.  Reference: Eunice Usher, P.E. FMOC Operations  <br />In‐House Construction Manager, (239) 656‐7800   <br />Senior Project Engineer­ SR 5, US 1 Milling and Resurfacing, (11/2009 – 3/2010):   <br />The project scope includes millings and resurfacing of a 2 mile stretch of US 1 in Palm  <br />Beach County. This is an urban construction project which includes minor widening,  <br />pavement repairs, drainage and pipe lining, signalization, signing and pavement  <br />markings and landscaping improvement. Reference: Jacques Beaubrun – WPB  <br />Operations Construction Manager, (561) 719‐7912   <br />Senior Project Engineer­ City of West Palm Beach, 24th and 25th Street, Streetscape  <br />Milling and Resurfacing, (11/2009 – 3/2010) The project scope includes millings and  <br />resurfacing, watermain installation, lighting and decorative streetscapes on this  <br />Federally funded Local Agency Participation project.  This is an urban construction  <br />project which included major public involvement and coordination with the Department  <br />of Transportation.  Reference: Brian Collins, PE 561.494.1040 Ext 2  <br />Senior Project Engineer­ SR 7, US 441 Reconstruction, (8/2008 – 3/2010). The  <br />project scope includes total reconstruction of the SR 7 corridor. This is a 25M urban  <br />construction project which includes widening, milling and resurfacing, drainage, large  <br />retention facilities, lighting, signalization and landscaping improvement. Reference:  <br />Hassan Abedi, FTL Operations Construction Manager, (954) 958‐7632   <br />Senior Project Engineer­ SR 15, US 441 Reconstruction, (12/2004 – 08/2007). The  <br />scope of this project included the reconstruction of the S‐curve located along the SR 15  <br />corridor in the City of Pahokee. Major items of work included: Community awareness  <br />initiatives for complete roadway closures; subsoil excavation; Geo‐synthetic soil  <br />reinforcement (geo‐grid); ARMI layer installation for the milling and resurfacing  <br />sections; major culvert replacements and rip‐rap installations in conjunction with AB  <br />Mattress operations. Reference: Deb Ihsan, WPB Construction Operations Manager  <br />(561) 432‐4966  <br />EDUCATION <br />B.S. Civil Engineering, <br />University of Florida, 1996 <br />REGISTRATIONS <br />Florida Professional <br />Engineer License No.: <br />56969 <br />Florida Certified General <br />Contractor License No. <br />1511653 <br />TRAINING AND <br />CERTIFICATIONS: <br />TIN: M620725711660 <br />Asphalt Paving Level 1 <br />Earthwork Level 1 <br />Earthwork Level 2 <br />Nuclear Surface Moisture <br />Density Certification <br />QC Manager <br />IMSA - WZTC Safety <br />Program <br />Advance MOT <br />WZTC Level 2 – Traffic <br />Safety in the Work Zone <br />Erosion Control and <br />Stormwater Management <br />Page 3| 17