My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 12:02:34 PM
Creation date
6/14/2012 11:51:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RODERICK MYRICK, PE, GC <br />Construction Program Management <br />SUMMARY OF QUALIFICATIONS <br />Mr. Myrick has 15+ years of transportation design‐build, construction and emergency <br />response management experience in varying roles, his latest as responsible for business <br />development and the management of a construction engineering and inspection <br />division. He has demonstrated his diverse skills in several areas and is willing to make <br />the tough management or technical decisions that are in the best interest of the client <br />and his firm. Mr. Myrick has excellent communication and technical skills and will add <br />immeasurable value to any project or team. <br />PROJECT EXPERIENCE <br />Project Engineer SR 90, US 41 Milling and Resurfacing, (12/2010 – 8/2011): The <br />project scope includes millings and resurfacing of a 4 mile stretch of US 41 in Collier <br />County. This is a rural construction project which includes bridge traffic railing <br />modifications, shoulder rework, asphalt, signalization, signing and pavement markings <br />and guardrail retrofits. Roderick is currently managing 3 project concurrently on this <br />assigned, an additional mill and resurface project and a design build urban ADA <br />compliance project in the City of Naples. Reference: Eunice Usher, P.E. FMOC Operations <br />In‐House Construction Manager, (239) 656‐7800 <br />Senior Project Engineer SR 5, US 1 Milling and Resurfacing, (11/2009 – 3/2010): <br />The project scope includes millings and resurfacing of a 2 mile stretch of US 1 in Palm <br />Beach County. This is an urban construction project which includes minor widening, <br />pavement repairs, drainage and pipe lining, signalization, signing and pavement <br />markings and landscaping improvement. Reference: Jacques Beaubrun – WPB <br />Operations Construction Manager, (561) 719‐7912 <br />Senior Project Engineer City of West Palm Beach, 24th and 25th Street, Streetscape <br />Milling and Resurfacing, (11/2009 – 3/2010) The project scope includes millings and <br />resurfacing, watermain installation, lighting and decorative streetscapes on this <br />Federally funded Local Agency Participation project. This is an urban construction <br />project which included major public involvement and coordination with the Department <br />of Transportation. Reference: Brian Collins, PE 561.494.1040 Ext 2 <br />Senior Project Engineer SR 7, US 441 Reconstruction, (8/2008 – 3/2010). The <br />project scope includes total reconstruction of the SR 7 corridor. This is a 25M urban <br />construction project which includes widening, milling and resurfacing, drainage, large <br />retention facilities, lighting, signalization and landscaping improvement. Reference: <br />Hassan Abedi, FTL Operations Construction Manager, (954) 958‐7632 <br />Senior Project Engineer SR 15, US 441 Reconstruction, (12/2004 – 08/2007). The <br />scope of this project included the reconstruction of the S‐curve located along the SR 15 <br />corridor in the City of Pahokee. Major items of work included: Community awareness <br />initiatives for complete roadway closures; subsoil excavation; Geo‐synthetic soil <br />reinforcement (geo‐grid); ARMI layer installation for the milling and resurfacing <br />sections; major culvert replacements and rip‐rap installations in conjunction with AB <br />Mattress operations. Reference: Deb Ihsan, WPB Construction Operations Manager <br />(561) 432‐4966 <br />EDUCATION <br />B.S. Civil Engineering, <br />University of Florida, 1996 <br />REGISTRATIONS <br />Florida Professional <br />Engineer License No.: <br />56969 <br />Florida Certified General <br />Contractor License No. <br />1511653 <br />TRAINING AND <br />CERTIFICATIONS: <br />TIN: M620725711660 <br />Asphalt Paving Level 1 <br />Earthwork Level 1 <br />Earthwork Level 2 <br />Nuclear Surface Moisture <br />Density Certification <br />QC Manager <br />IMSA - WZTC Safety <br />Program <br />Advance MOT <br />WZTC Level 2 – Traffic <br />Safety in the Work Zone <br />Erosion Control and <br />Stormwater Management <br />Page 3| 17
The URL can be used to link to this page
Your browser does not support the video tag.