Laserfiche WebLink
<br />Roderick Myrick, PE, Page 2  <br />Senior Project Engineer­ Palm Beach County Signalization and Debris Management Coordinator,  <br />(10/2005 – 02/2006). Mr. Myrick’s duties included coordination with local jurisdictions for signalization,  <br />debris collection and damage assessment coordination. He was responsible for the oversight and contract  <br />administration for signalized intersections restoration efforts in Broward and Palm Beach Counties. Mr.  <br />Myrick affectively managed signal restoration with 14 various signal contractors within the State of Florida.  <br />He served as the liaison between all maintaining agencies, various contractors, field personnel, local  <br />municipalities and other stakeholders affected by the Hurricanes that impacted this region. Mr. Myrick  <br />successfully completed all signal and debris restorations within the 180 day time frame for FHWA and  <br />FEMA contracts Reference: Deb Ihsan, WPB Construction Operations Manager (561) 432­4966  <br />Page 3| 18