Laserfiche WebLink
<br />GEORGE GUERRERO, GC  <br />Construction Program Management   <br />PROJECT EXPERIENCE:  <br />City of Sunny Isles Beach Project # 31­2214­000­0045;  Newport Fishing Pier and  <br />Restaurant Construction, Sr. Inspector, Responsible The coordination for the pile  <br />driving and vibration monitoring Inspectors, reviewing and monitoring the construction  <br />documentation, ensure compliance with the contract documents and specifications.   <br />Scope of work for this project is the removal of the existing pier wood structure, deck  <br />and columns and construction, in the same footprint, of a new double Tee concrete deck  <br />over 24” pre stress concrete piles pier.  Towards the East side of the pier a new  <br />restaurant will also be constructed. New electrical distribution system and transformer  <br />along with adjacent areas restoration will be included. Project Started: March 2012,  <br />Project Completed:  Current    <br />FDOT Project # FM 423810­1­58­01; West Palm Beach (LAP) Seaboard Train  <br />Beautification Project. Reference: COWPB, Project Manager; Jeffrey E. Halverson  <br />(561) 494‐1092. Sr. Inspector, Responsible The coordination for the material testing  <br />with VT Inspectors, reviewing and monitoring the construction documentation, ensure  <br />compliance with the contract documents and specifications.  Scope of work for this  <br />project is pedestrian and landscape improvements to the Seaboard Train Station site,  <br />including construction of a pedestrian plaza with landscaping elements, irrigation and  <br />lighting on the area immediately east of the existing Seaboard Train Station building,  <br />reconfiguration and landscape improvements to the surface parking lots on the north  <br />and south of the building, and some pedestrian improvements along the Tamarind  <br />Avenue right‐of‐way between Clematis Street and Fern Street. Project Started March  <br />2012, Project Completed:  Current   <br />I595 Express Corridor Improvement ($1.25 B) P3 Project. Alejandro Montenegro  <br />P.E:  CES Consulting and Testing, Inc. Mr. Guerrero was working on this project in all (6)  <br />six segments A, B, C, D, E and the east and west greenways. His responsibilities included;  <br />quality assurance and collection, sampling and storage of concrete samples as required,  <br />also conducted liquid properties testing as required by FDOT.  Project Started: October  <br />2010, Project Completed: Current  <br />MDX GEC Contract. Yan Chang P.E.: EAC Consulting Engineers, Inc. Senior Construction  <br />Inspector­Supervised the construction/repair of concrete bridges and roadway  <br />improvement work for the Miami Dade Expressway Authority. Inspected structures to  <br />determine structural soundness and compliance with specifications, building codes, and  <br />other regulations. Responsible for contract compliance and documentation,  <br />communication with the contractor regarding work quality, field adjustments and non‐ <br />compliance work. Project Started: January 2008, Project Completed: July 2010.   <br />FDOT District 6 CEI Consultant Residency. John Hart P.E.:  Carnahan, Proctor & Cross  <br />Consulting Engineers, Inc. Senior Roadway Inspector‐ District CEI Residency, projects  <br />involve managing portion of the District construction work program, administering  <br />projects from pre‐construction and plans review phases to certification of final estimate  <br />package. Provided inspection, testing, and reporting of multiple operations including  <br />bridge rehabilitation, concrete pavement slab re‐placement and grinding, asphalt  <br />paving, stripping, street signalization and lighting work. Project Started: December  <br />2004, Project Completed: January 2008  <br />EDUCATION <br />University of Puerto Rico, <br />San Juan, Puerto Rico, <br />School of Civil Engineering <br />1990 Magna Cum Laude <br />REGISTRATIONS <br />General Contractor <br />Lic. #213100 <br />CERTIFICATIONS <br />TIN# G660300633340; <br />CTQP Earthwork <br />Construction Level 1 and 2 , <br />CTQP Asphalt Paving Level <br />1 and 2, Concrete <br />Specification Level 1 <br />CTQP Pile Driving, ACI <br />Field Technician Level 1, <br />Primavera Scheduling <br />Program Certified, MOT – <br />Intermediate <br />Page 3| 19