My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 12:02:34 PM
Creation date
6/14/2012 11:51:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />George Guerrero, Page 2 <br />US1 from Cutler Ridge to SW 264 St. Enrique Zuniga P.E.: Pistorino and Alam Consulting Engineers, <br />Inc. Senior Roadway/Bridge Inspector‐Supervise the construction of road US‐1 from Cutler Ridge to SW <br />264 St. Duties include review and interpretation of plans, blueprints, specifications, and construction <br />methods to ensure compliance to legal requirements. Measured dimensions and verified level, alignments, <br />and elevation of structures to ensure compliance to building plans and codes. Project Started: January <br />2004, Project Completed: December 2004 <br />I75 NB Ramp (at 826 NB) Widening. Eduardo Rodriguez P.E.: Parsons Brinckerhoff Construction <br />Services, Inc. Roadway Inspector/ Project Engineer Supervised the construction of concrete noise walls, <br />concrete traffic railing, I‐75 NB Ramp (at 826 NB) widening and post tensioning retrofit, MSE panels and <br />drainage installation. Duties included field inspection, monitor work progress and quality, daily <br />communication with the contractor regarding field adjustment and compliance with Technical <br />Specifications. Project Started: September 2001, Project Completed: January 2004 <br />OrlandoOrange County Expressway Authority, State Road 429, Toll Plaza & Administration <br />Buildings, William Griffith P.E.: C.A.P. Engineering Consultants, Inc. Project Engineer ‐ Supervised the <br />construction of a 12.5 miles of State Road 429, toll plaza and administration buildings for the Orlando‐ <br />Orange County Expressway Authority. Also involved in the construction of aircraft rated bridges, concrete <br />box culvert, communications building and infrastructure projects for the Orlando International Airport <br />Authority. Project Started: January 1997. Project Completed: September 2001 <br />Construction Residential and Commercial Buildings. Diego Saez P.A.: Diego Saez, P.E. Architect & <br />Developers. Project Engineer ‐Managed construction of residential and commercial buildings. Responsible <br />for the timely and budgeted construction of projects. Monitored program cost activity to achieve an “in <br />budget” result. Prepared quotations utilizing supplier information, cost standards and technical <br />information. Maintained change request log and control changes. Supervised and managed subcontractors <br />to ensure quality of work. Project Started: June 199, Project Completed: December 1996 <br />Residential and Commercial Structural Steel Fabrication. Howard Bentle: Central Fabricators, Inc. <br />Project Engineer‐ Managed the fabrication and erection of structural steel commercial projects. Assisted <br />senior management in project personnel and project administration. Responsible for the timely and <br />budgeted execution or work. Assist project engineer on material expediting. Conduct estimate and wage <br />review with superintendent. Project Started: June 1990, Project Completed: February 1992 <br />Page 3| 20
The URL can be used to link to this page
Your browser does not support the video tag.