My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 12:02:34 PM
Creation date
6/14/2012 11:51:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />HANZEL RUBI <br />Construction Observation/Inspection/Shop Drawing Review <br />SUMMARY OF QUALIFICATIONS <br />Mr. Rubi has over 4 years of experience in the engineering/construction field, as an <br />inspector. In his current position as a Field Coordinator, he is involved with water & <br />sewer systems, lift stations, construction and rehabilitation, drainage systems and <br />roadways (widening and new), and parks. <br />PROJECT EXPERIENCE <br />Field Coordinator, Calvin, Giordano & Associates, Inc. Fort Lauderdale, FL <br /> Review plans and specifications of assigned project with construction <br />supervisor; attend pre‐construction conferences. <br /> Inspect materials for identification as conforming to specifications and plans. <br /> Inspect all phases of construction of public works and private development <br />projects. <br /> Inspect various structures such as utilities, streets, sidewalks, gutters, curb, <br />drainage, sewer, water and other off‐site construction; check line, grade, size, <br />elevation and location of structures for conformity with specifications and <br />regulations. <br /> Record amounts of materials used and work performed; prepare necessary <br />reports for progress payments. <br /> Help locate other utility structures ahead of work sites. <br /> Coordinate work with other City departments and utilities. <br /> Determined quantity of work performed for contractor's payments. <br /> Checked to determine if barricades, lights, and flagmen are properly utilized at <br />construction sites. <br /> Assumed personal responsibility for ensuring that duties are performed in a <br />safe, efficient manner. Performed other related duties as assigned. <br /> Responsible for the daily inspection and testing. <br /> General oversight of earthwork placement and testing, sub‐grade and base <br />inspection and testing. <br /> Maintained an inspector's diary and prepared written reports. <br /> Worked with the City of Weston and Parkland as Engineering and Zoning <br />Inspector. <br />CERTIFICATIONS <br />Asphalt Paving Technician <br />Earthwork Construction <br />Inspection <br />Nuclear Safety Certification <br />Page 3| 28
The URL can be used to link to this page
Your browser does not support the video tag.