My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 12:02:34 PM
Creation date
6/14/2012 11:51:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />JUAN CARLOS ECHAVARRIA <br />Construction Observation/Inspection/Shop Drawing Review <br />PROJECT EXPERIENCE <br />Calvin, Giordano & Associates, Fort Lauderdale FL (08/2011 – Present) Field <br />Coordinator/ Construction Inspector: Review construction documents and inspect the <br />construction of projects from the design phase through completion of construction. <br /> Exercise considerable independent judgment in the monitoring of project <br />progress in relation to construction schedule and reporting to the field manager, <br />project administrator and engineer <br /> Record and report all unacceptable work and follow up on defective work <br />corrected by the contractor <br /> Verify and review pay requisitions from the contractor to include measuring all <br />field quantities for correctness <br /> Maintain daily reports of construction activities and inspections along with <br />photographs documenting construction progress <br /> Tasked with inspecting over 30,000 feet of watermain, 5,000 feet of drainage <br />pipes, 3 pump stations, 9 drainage wells and 50 structures as well as 70,000 <br />square yards of paving and 15,000 feet of curb and gutter <br />Horizon Contractors, Hialeah FL, 01/2005 ‐‐ 08/2011, Construction Inspector: <br /> Oversee projects from permit approvals through construction and community <br />turnover <br /> Responsibility for the successful delivery on new projects through the use of <br />construction schedules, contract documents, land development budgets, <br />environmental studies, geotechnical reports, engineering and construction plans <br />and permit compliance reports <br /> Scheduling and coordinating construction activities, supervising crews and <br />subcontractors, working with engineers, project managers and city officials <br /> Assists the project manager with preparation of pay requisitions for the head <br />office <br />PROJECTS COMPLETED <br /> City of Miami – 36th Street DOT Drainage Improvements <br /> City of Miami – Flagler Drainage and Utilities Improvements <br /> City of Miami Beach – South Pointe Drainage Improvements <br /> City of Miami Beach – Drainage Improvements and Paving <br /> Town of Bay Harbor Islands – Streetscape Enhancement <br />EDUCATION <br />Miami Dade College, <br />Miami, FL (01/2004 -- <br />08/2005), Associate of Art <br />in Business Administration <br />CERTIFICATIONS/ <br />TRAINING <br />Completed OSHA <br />Construction Safety and <br />Health Course <br />ATSSA Florida Advanced <br />Work Zone Traffic Control <br />Course <br />Confined Space Trained <br />Page 3| 29
The URL can be used to link to this page
Your browser does not support the video tag.