Laserfiche WebLink
<br />RICK DEROSIA, PE  <br />Constructability Review  <br />SUMMARY OF QUALIFICATIONS   <br />Mr. DeRosia has more than 30 years of professional experience in project management  <br />and design of water and wastewater treatment facilities.  His experience with  <br />construction and project management is an asset for any project.  Mr. DeRosia is very  <br />familiar with various clients, vendors and subcontractors in all phases of municipal  <br />design and construction.   <br />PROJECT EXPERIENCE  <br />Project Engineer:   He has designed, permitted and managed projects for water and  <br />wastewater pumping stations, water and wastewater treatment plants, wet wells and  <br />water distribution systems.  His projects included pump stations for Miami‐Dade Water  <br />and Sewer Authority, upgrades to Miami‐Dade North District Wastewater Treatment  <br />Plant and Miami‐Dade Northwest Wellfield Water Distribution System.  <br />Project Manager:  He has been manager of numerous construction projects where he  <br />was required to create budgets, set up schedules, perform inspections, prepare monthly  <br />cost reports, prepare change orders, provide punch lists and finalize project close out.   <br />His responsibilities included coordination of vendors, sub‐contractors, office personnel,  <br />sub consultants and clients to meet all goals throughout the projects.   <br />WATER AND SEWER DESIGN EXPERIENCE  <br />Miami‐Dade WASA Water Distribution.  Design and manage new 72” water transmission  <br />main, 15 new pump buildings with 24” well pumps and generator/switchgear building.    <br />Miami‐Dade WASA Pump Station 12‐P5.  Design and manage new caisson pump station,  <br />force main, gravity line, obtain permits, and perform inspections.  <br />WATER AND SEWER CONSTRUCTION EXPERIENCE  <br />City of Cooper City Wastewater Treatment Plant.  Project Manager for construction of  <br />new two mgd treatment plant, blower building, chlorination building, electrical building,  <br />piping, valves and controls.  <br />City of Pembroke Pines Wastewater Treatment Plant.  Project Manager for construction  <br />of new two million gallon per day treatment plant, headworks facility, generator  <br />building, odor control units, high service pump station, chlorination building, diesel fuel  <br />facility, gravity and force main piping.  <br />City of Cooper City Sludge Treatment Facility.  Project Manager for construction of  new  <br />concrete sludge drying beds, piping, sludge conveyor system, paving, drainage and  <br />control system.   <br />City of Lake Worth Pump Station Rehabilitation.  Project Manager for construction of  <br />removing and replacing high service pumps, pipe and valves, generator, electrical  <br />equipment, fuel tanks, instrumentation and controls.  Install by‐pass pumping systems,  <br />force main piping, paving and drainage.  <br />City of Port St. Lucie Booster Pump Station.  Project Manager for the construction of one  <br />million gallon prestressed storage tank, horizontal pumps, control valves, generator,  <br />switchgear, paving and drainage.    <br />EDUCATION <br />Bachelor of Science in <br />Civil Engineering, Clarkson <br />University, May 1975 <br />PROFESSIONAL <br />REGISTRATION <br />Professional Engineer <br />State of Florida, No. 38604 <br />PROFESSIONAL <br />ASSOCIATIONS <br />Member Florida <br />Engineering Society <br />CIVIC ACTIVITIES <br />Member Boys & Girls Club <br />of North Lauderdale Board <br />Page 3| 35