<br />Rick DeRosia, PE, Page 2
<br />Martin County Leachate System. Project Manager for construction of new steel storage tanks, bioreactor
<br />systems, sand filter system, reverse osmosis facility, structural slabs, lift station, force main piping, paving,
<br />grading, drainage, electrical and control system.
<br />City of Riviera Beach Master Lift Station. Project manager for construction of new building, horizontal
<br />pumping system, wet well, telemetry system, generator, switchgear, diesel fuel tank, paving, drainage and
<br />landscaping.
<br />Town of Davie Wastewater Treatment Plant Upgrades. Project Manager for construction of new two mgd
<br />steel treatment tank, headworks facility, sludge press facility, sludge conveyor system, blower building,
<br />steel ductwork, lift station, generator, switchgear and protective coatings.
<br />City of Coral Springs East Pump Station. Project Manager for construction of new booster pump station
<br />building, two million gallon prestressed concrete tank, underground propane fuel tank system, site
<br />retaining wall, landscaping, paving and drainage.
<br />Broward County Digester Improvements. Project Manager for construction of two million gallon
<br />prestressed digesters with steel floating covers, return sludge pumps, rotary sludge pumping system, boiler
<br />system, methane gas burning system, air compressor system, 48” deep injection well force main piping,
<br />electrical and controls.
<br />North Springs Improvement District Water Plant Additions. Project Manager for construction of new
<br />administration building, structural concrete filter beds, lime silo, lime slaker system, pumping system, retaining
<br />wall, chlorination system, security system, paving, landscaping, drainage and fiber optic control system.
<br />Coral Springs Improvement District Water Supply Wells. Project Manager for 16’’ force main piping
<br />system, canal crossing, water supply wells, automatic control valves, fiber optic control system and
<br />electrical ductbanks.
<br />City of West Palm Beach Rehabilitation of Existing Clarifiers. Project Manager for construction ;of
<br />removing and replacing eight clarifiers, dewatering system, new scum pumps, electrical and controls.
<br />Broward County North Regional Wastewater Treatment Plant Digester Cover. Project manager for
<br />construction of new steel digester cover, demolition, sandblasting, painting, recirculation pump, digester
<br />gas guns and air compressor system.
<br />South Florida Water Management District Hurricane Hardening Project. Project Manager for construction
<br />of applying gunite to strengthen walls, reinforcing steel, protective coatings, new HVAC system, roofing and
<br />electrical.
<br />City of West Palm Beach Transfer Pump Stations. Project Manager for installation of new axial pumping system,
<br />wetwells, baffles, troughs, piping, valves, by‐pass pumping, flow meters, controls and electrical system.
<br />City of Fort Lauderdale Poincianna Park Pump Station. Project Manager for construction of new horizontal
<br />pump system, two million gallon prestressed storage tank, generator, switchgear, fuel tank system,
<br />telemetry system, controls, drainage, paving and landscaping.
<br />City of Boca Raton Primary Clarifier Rehabilitation. Project Manager for removing and replacing two one
<br />hundred foot clarifier mechanisms, demolition, odor control system, hvac system, chemical supply system,
<br />in line flow meters, electrical and controls. Page 3| 36
|