<br />Rick DeRosia, PE, Page 2  <br />Martin County Leachate System. Project Manager for construction of new steel storage tanks, bioreactor  <br />systems, sand filter system, reverse osmosis facility, structural slabs, lift station, force main piping, paving,  <br />grading, drainage, electrical and control system.   <br />City of Riviera Beach Master Lift Station.  Project manager for construction of new building, horizontal  <br />pumping system, wet well, telemetry system, generator, switchgear, diesel fuel tank, paving, drainage and  <br />landscaping.   <br />Town of Davie Wastewater Treatment Plant Upgrades.  Project Manager for construction of new two mgd  <br />steel treatment tank, headworks facility, sludge press facility, sludge conveyor system, blower building,  <br />steel ductwork, lift station, generator, switchgear and protective coatings.  <br />City of Coral Springs East Pump Station.  Project Manager for construction of new booster pump station  <br />building, two million gallon prestressed concrete tank, underground propane fuel tank system, site  <br />retaining wall, landscaping, paving and drainage.  <br />Broward County Digester Improvements.  Project Manager for construction of two million gallon  <br />prestressed digesters with steel floating covers, return sludge pumps, rotary sludge pumping system, boiler  <br />system, methane gas burning system, air compressor system, 48” deep injection well force main piping,  <br />electrical and controls.  <br />North Springs Improvement District Water Plant Additions.  Project Manager for construction of new  <br />administration building, structural concrete filter beds, lime silo, lime slaker system, pumping system, retaining  <br />wall, chlorination system, security system, paving, landscaping, drainage and fiber optic control system.  <br />Coral Springs Improvement District Water Supply Wells.  Project Manager for 16’’ force main piping  <br />system, canal crossing, water supply wells, automatic control valves, fiber optic control system and  <br />electrical ductbanks.   <br />City of West Palm Beach Rehabilitation of Existing Clarifiers.  Project Manager for construction ;of  <br />removing and replacing eight clarifiers, dewatering system, new scum pumps, electrical and controls.  <br />Broward County North Regional Wastewater Treatment Plant Digester Cover.  Project manager for  <br />construction of new steel digester cover, demolition, sandblasting, painting, recirculation pump, digester  <br />gas guns and air compressor system.  <br />South Florida Water Management District Hurricane Hardening Project.  Project Manager for construction  <br />of applying gunite to strengthen walls, reinforcing steel, protective coatings, new HVAC system, roofing and  <br />electrical.  <br />City of West Palm Beach Transfer Pump Stations.  Project Manager for installation of new axial pumping system,  <br />wetwells, baffles, troughs, piping, valves, by‐pass pumping, flow meters, controls and electrical system.  <br />City of Fort Lauderdale Poincianna Park Pump Station.  Project Manager for construction of new horizontal  <br />pump system, two million gallon prestressed storage tank, generator, switchgear, fuel tank system,  <br />telemetry system, controls, drainage, paving and landscaping.  <br />City of Boca Raton Primary Clarifier Rehabilitation.  Project Manager for removing and replacing two one  <br />hundred foot clarifier mechanisms, demolition, odor control system, hvac system, chemical supply system,  <br />in line flow meters, electrical and controls.   Page 3| 36