My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 12:02:34 PM
Creation date
6/14/2012 11:51:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 4| 2 <br />These sites allow the residents and other stakeholders to access up‐to‐date information in an easy to use <br />graphical interface 24 hours per day, 7 days per week. <br />This step will begin immediately with the City, but will not begin with the residents until all information <br />has been submitted to the City for review and approval prior to becoming public information. We are <br />aware of the delicate nature of work being performed within neighborhoods and public right of ways and <br />would not want to jeopardize the relationship between the City and its residents. This step will also <br />continue through project completion. <br />Project Implementation <br />CGA will aggressively peruse the completion of each phase of this project. Again, CGA has a vast experience <br />with local municipalities and we are aware of the sensitive nature that is CIP budgets & schedules. Many <br />stakeholders, residents and elected officials are watching these projects from their homes on a daily basis <br />and this brings with it extra pressure to perform. CGA’s main office is located in South Florida and much of <br />our staff is in the Sunny Isles Beach area on a daily basis. This will help us facilitate our aggressive <br />schedule. Throughout the process weekly progress meetings will be held to ensure that every entity <br />involved is up to speed and all loose ends are being followed up. <br /> Construction Management and Administration – Per the RFQ, CGA will provide certified and <br />registered staff that will remain on‐site a minimum of six hours per working day to guide and <br />administer all construction processes in representation of the City. These services provide ease of <br />mind that conflicts will be quickly resolved, surprises will be minimized and final budgeted costs <br />will be held through to completion. <br /> Meetings and Visits CGA will coordinate and document the following through the overall team: <br /> Pre‐Construction meeting <br /> Value Engineering meetings <br /> Attendance of resident information meetings <br /> Weekly construction meetings <br /> Contract specific meetings <br /> Specialty A/E Consultant site visits <br /> Equipment start‐ups <br /> Field Inspections ‐ The lead inspector or assistant inspector will document the following on a daily basis: <br /> Weather Conditions <br /> Contractors work force and description of work <br /> Subcontractors on site and work force <br /> All equipment onsite and utilized <br /> Visitors to project site <br /> Tests and results <br /> Construction difficulties and measures taken <br /> Significant delays <br /> Disputes between City, Resident Engineer, or Contractor <br /> Any field directives issued <br /> Record of materials <br /> Summary of field meetings <br /> Any non conforming work <br /> Log of photos taken <br /> MOT Inspections <br /> Request for services during tie‐ins
The URL can be used to link to this page
Your browser does not support the video tag.