My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CIMA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
CIMA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 2:20:54 PM
Creation date
6/14/2012 2:13:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />Gateway Park Construction Management Services RFQ12 -06 -01 I <br />i <br />Red Road SR 823 between the Turnpike and <br />Pembroke Road: CIMA is the primary consultant on this <br />project, which involved resurfacing this limited urban <br />corridor located in West Broward County. The corridor <br />serves as a major arterial roadway between Dade County <br />and Broward County. This resurfacing project included <br />shoulder widening, signalization, lighting, drainage, <br />pavement markings, signage and landscaping. <br />Red Road SR 823 between Pembroke Road and Pines <br />Blvd.: CIMA is the primary consultant on this project, <br />which involved resurfacing this limited urban corridor <br />located in West Broward County. The corridor serves as a <br />major arterial roadway between the City of Miramar and <br />the City of Pembroke Pines in Broward County. This <br />resurfacing project included shoulder widening, <br />signalization, pavement markings, signage and <br />landscaping. <br />1 -595 between Pine Island Road and Davie <br />Road: CIMA was the primary consultant on this <br />project, which involved resurfacing this limited <br />access corridor located in Central Broward <br />County. The corridor serves as a major arterial <br />roadway for the entire County and provides <br />access to the Fort Lauderdale International <br />Airport. This resurfacing project included <br />pavement markings, signage and landscaping. <br />CIMA is prequalified with the Florida Department of Transportation and Miami Dade County to <br />provide Construction Management and Engineering Services on construction projects. See <br />Section 7 for certifications. <br />Cl NIA's Qualification Statement Page 3of16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.