Laserfiche WebLink
` "), or sut4 0"" <br />The Contractor, on an immediate and first priority basis, shall make available all its <br />resources and equipment to the City in the event of an Act of God (i.e. storm, tornado, <br />or hurricane) or an auto accident that causes a tree to fall and block a roadway or <br />pedestrian area, or any other emergency deemed by the City Manager or his designee. <br />Work may include but is not limited to roadway clearing, extensive clean -up and disposal <br />activities. All debris removed from the City will be legally disposed of at an EPA and /or <br />City approved dump site. Each May 1St, the Contractor shall submit, for City approval, a <br />hurricane mobilization and preparedness plan specifically relating to manpower, <br />equipment and scheduling. <br />3.11.6 CITY'S REPRESENTATIVE <br />The Contractor shall be available to meet with all public utilities to locate all irrigation and <br />hydraulic lines prior to excavation by the utility company. The Contractor is to act as the <br />City's representative in order to avoid unnecessary damage to irrigation lines. <br />3.11.7 CATCH BASINS <br />No fuel, oils, solvents, or similar materials are to be disposed of in any catch basins. The <br />Contractor must closely adhere to local, state, and Federal Environmental Protection <br />Agency requirements, and is responsible for all non - compliance penalties. <br />END OF SECTON <br />City of Sunny Isles Beach I Request for Proposal No. 12 -05 -01 C, <br />