My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-07-01) Fleet Bus Maintenance and Repair Services
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2012 4:49:17 PM
Creation date
8/1/2012 4:46:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"ry of suss �r <br />applicable the City reserves the right to negotiate extended hours and or decrease hours, with at <br />least seven (7) days notice to Contractor. <br />Contractor shall operate the facility a minimum of 56 hours per week except for a holiday as <br />authorized by the City (New Year's Day, Thanksgiving, Christmas). Any changes in hours of <br />service (other than those dictated by emergencies) shall be made with prior approval by the City. <br />Successful contractor shall have access to check and respond to emalls, at least 3x's a day, <br />morning, afternoon and late PM. Fine tuning to maximize revenues and minimum costs must be <br />an ongoing priority. It shall be recognized that City budget decisions may reduce or extend <br />operating hours. <br />3.4 PROTECTION <br />3.4.1 The contractor shall be solely responsible for City vehicles and equipment while in their <br />possession for maintenance and /or repairs. <br />3.4.2 Vehicles left at contractor's facility during non - business hours to complete service must <br />be stored in a secure area. <br />3.4.3 All minimum safety standards required by Municipal, County, State and Federal <br />ordinances and laws shall be strictly met by the contractor. <br />3.5 ESTIMATES <br />Bidder shall provide written "not to exceed" estimates on any repair. The estimate will include the <br />estimated number of hours, hourly rate, estimated material cost and completion date. It will be <br />the bidder's responsibility to ensure they have all the equipment and materials to provide <br />accurate estimates. No work shall be performed by the contractor before authorization is <br />provided by the City's Fleet Manager or designee. <br />3.6 HOURLY RATE <br />The hourly rates quoted shall include full compensation for labor, equipment use, and any other <br />cost to the bidder. <br />3.7 QUALITY OF PARTS TO BE FURNISHED <br />Parts furnished to the City shall meet or exceed the quality of the parts furnished originally for <br />the equipment (OEM). However, if the original manufacturer has updated the quality of the parts <br />for current production, parts supplied under this contract shall equal or exceed the updated <br />quality. Failure to provide items of such quality will be cause for rejection and / or return of said <br />item. The burden of proof and cost of analysis will be the Contractor's. There will be no reboxing <br />of parts. <br />City of Sunny Isles Beach I Request for Proposal No. 12 -07 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.