My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-07-01) Fleet Bus Maintenance and Repair Services
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2012 4:49:17 PM
Creation date
8/1/2012 4:46:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4�4, of StA A" <br />from which turnaround time is measured will begin with the City's authorization to <br />process with the repair. <br />C. Major component overhauls or replacements: Major component overhauls or <br />replacements within the first four (4) months of the initial contract year will require <br />written authorization from the City. The amount of time allowed for these repairs will be <br />decided by the City as a function of the need for the vehicle and the nature of the repair. <br />D. Vehicles Exempted by the City: In instances where the City derides that it would be in <br />the City's best interest to temporarily waive vehicles turnaround performance standards <br />for all or selected vehicles, the City will provide the Contractor written notification of this <br />decision including specification of the time period for which these standards will be <br />relaxed. <br />The Contractor is responsible for notifying the representative of user departments by telephone, <br />email or in person when any vehicle will be out -of- service for maintenance or repair for more <br />than 24 hours. <br />3.10 REWORK <br />All rework must be performed within 24 hours after City notification of corrective action. <br />3.11 AD HOC REPORTS <br />The Contractor may be required to assist in the generation of any ad hoc reports as the City or <br />any of its user departments may request. In addition some users may require copies of repair <br />orders when vehicles are picked up to document costs incurred that are eligible for Federal <br />reimbursement. All such requires must go through the City's Fleet Manager. <br />END OF SECTON <br />City of Sunny Isles Beach I Request for Proposal No. 12 -07 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.