supplemental or revised drawings and specifications. Subsequent to notification of modifications <br /> in the Work by City, Contractor shall submit a quotation estimating cost adjustments to the <br /> Contract Amount and/or the Contract Time necessary to execute the change. Contractor shall <br /> include the following information when responding: <br /> • Include a list of quantities of products required or eliminated and unit costs, with total <br /> amount of purchases and credits to be made. If requested, furnish survey data to <br /> substantiate quantities. <br /> • Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br /> discounts. <br /> • Include costs of labor and supervision directly attributable to the change. <br /> • Include an updated contractor's construction schedule that indicates the effect of the <br /> change, including but not limited to, changes in activity duration, start and finish times, <br /> and activity relationship. Use available total float, if any, before requesting an extension <br /> of the Contract Time. <br /> 10.2 CONTRACTOR INITIATED MODIFICATIONS <br /> • <br /> If latent or unforeseen conditions require modifications in the contract,the Contractor may propose <br /> changes by submitting a request for a change order to the City. Contractor shall use the change <br /> order request form approved by the City for said modification requests. The following MUST be <br /> submitted/included by Contractor: <br /> • A statement outlining reasons for the change and the effect of the change on the Work. <br /> Provide a complete description of the proposed change. Indicate the effect of the proposed <br /> change on the Contract Amount and the Contract Time. <br /> • A list of quantities of products required or eliminated and unit costs, with total amount of <br /> purchases and credits to be made. If requested, furnish survey data to substantiate <br /> quantities. <br /> • Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br /> discounts. <br /> • Cost of labor and supervision directly attributable to the change. <br /> • Comply with any applicable product requirements if the proposed change requires <br /> substitution of one product or system for product or system specified. <br /> 10.3 ALLOWANCES <br /> Allowance Adjustment. To adjust allowance amounts, Contractor shall base each Change Order <br /> proposal on the difference between purchase amount and the allowance, multiplied by final <br /> measurement of work-in-place. If applicable, Contractor shall also include reasonable allowances <br /> for cutting losses, tolerances, mixing wastes, normal product imperfections, and similar margins. <br /> Contractor also agrees to the following conditions: <br /> • Include installation costs in purchase amount only where indicates as part of the <br /> allowance. <br /> • If requested, prepare explanation and documentation to substantiate distribution of <br /> overhead costs and other margins claimed. <br /> • Submit substantiation of a change in scope of work, if any, claimed in change orders <br /> C6154-1617-036-EBSARY FOUNDATION CO. 9 S 11 B <br />