Reso 2017-2663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 3:08:21 PM
Creation date
3/1/2017 3:07:41 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2663
Date (mm/dd/yyyy)
02/16/2017
Description
Agreement #1 w/Ebsary to Construct Ped/Emergency Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ARTICLE 7. REQUESTS FOR INFORMATION (RFI) <br /> The Contractor shall submit in writing a Request for Information (RFI) to the City where the <br /> Contractor believes that the specifications or drawings are unclear or conflict. All requests <br /> must be submitted in a manner that clearly identifies the drawing and/or specification section <br /> where clarification or interpretation is being requested. <br /> ARTICLE 8. FIELD DIRECTIVES <br /> The City may at times issue Field Directives to the Contractor based on visits to the Project <br /> site. Such Field Directives shall be issued in writing and the Contractor shall be required to comply <br /> with such directive. Where the Contractor believes that the directive is outside the scope of the <br /> Work, the Contractor shall, within 48 hours, notify the City that the Field Directive is outside <br /> the scope of the Work. At that time the Field Directive may be rescinded or the Contractor may be <br /> required to submit a request for a Change Order proposal. Where the Contractor is notified of the <br /> position that the Field Directive is within the scope and the Contractor disagrees, the Contractor <br /> shall notify the City that the Contractor reserves the right to make a claim for the time and <br /> monies based on the Field Directive. At no time shall the Contractor refuse to comply with <br /> the directive. Failure to comply with the directive may result in a determination that the <br /> Contractor is in default of the Agreement. <br /> ARTICLE 9. CHANGE ORDERS <br /> 9.1 Changes in the quantity or character of the Work of the Project which are not properly the <br /> subject of Field Directives shall be authorized only by Change Orders approved in advance and <br /> issued in accordance with the guidelines of the City. <br /> 9.2 All changes to the Work must be pre-approved in writing,in advance,by the City in accordance <br /> with the value of the Change Order or the calculated value of the time extension. In the event <br /> Contractor fails to follow this procedure and performs additional Work without first obtaining pre- <br /> approval in writing by the City Manager or his designee, the Contractor shall not be entitled to any <br /> additional monies in connection with the additional Work performed. <br /> 9.3 In the event satisfactory adjustment cannot be reached for any item requiring a change in the <br /> Contract Amount, the City reserves the right at its sole option to either terminate the Agreement as <br /> it applies to the items in question and make such arrangements as may be deemed necessary to <br /> complete the disputed work; or may submit the matter in dispute as set forth in the dispute resolution <br /> procedures set forth in this Agreement. <br /> 9.4 On approval of any change increasing the Contract amount, Contractor shall ensure that the <br /> Bonds are increased accordingly. <br /> ARTICLE 10. SCOPE OF WORK MODIFICATION PROCEDURES <br /> 10.1 OWNER INITIATED MODIFICATIONS <br /> The City will issue a detailed description of proposed changes in the Work that may require an <br /> adjustment(s)to the Contract Amount or Contract Time. If necessary,the description will include <br /> C6154-1617-036-EBSARY FOUNDATION CO. 8 S I B <br />