My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Iron Sky
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-09-01 Automated License Plate Recognition
>
Responses
>
Iron Sky
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2012 12:09:38 PM
Creation date
10/4/2012 12:06:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Automated License Plate Recognition
Bid No. (xx-xx-xx)
12-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jason Haskins <br /> `..► Vice President, Delivery <br /> Mr. Haskins has led very larges scale deployments for over 10 years and brings a record of <br /> successful, hands-on experience to the complex infrastructure tasks required for the successful <br /> delivery of this project. Mr. Haskins has been involved in the design and delivery of every <br /> project Iron Sky has undertaken and understands the unique challenges that this project will <br /> present. <br /> Summary of Experience: <br /> Jason provides considerable experience in managing large municipal infrastructure projects <br /> ranging from the installation of city-wide fiber optic cabling to the reconstruction of the Talmadge <br /> Memorial Bridge in Savannah, GA. <br /> For the last 10 years Jason has managed federal, state and local government projects in excess <br /> of 5 million dollars from the design phase through completion of the project. Jason's clear <br /> understanding of systems operations and how they contribute to a project's overall performance <br /> enables him to help clients effectively address today's demanding public works challenges. By <br /> overseeing the installation and operation of complex engineering, industrial, and construction <br /> projects he ensures that the contracts, plans, specifications and ultimately, the results, conform <br /> in every way to the client's needs and vision. Throughout the process, his guiding principle is <br /> that any problem is merely an opportunity for a solution. The result is a successful project <br /> delivered on time and on budget that exceeds the client's expectations. <br /> Relevant Past Performance for which Jason had direct responsibility: <br /> Talmadge Memorial Bridge Repair <br /> Savannah, Georgia <br /> Mr. Haskins managed the repair of the cable stay attenuating system from the development of <br /> comprehensive repair procedures, design and installation of swing stage access to the height of <br /> 425'to complete adherence to Georgia Department of Transportation project specifications. Key <br /> to the successful completion this project were the attention to details in the project specification <br /> in regards to installation tolerances, material specification and an ever present focus on safety <br /> working on a bridge 185' above one of America's International Ports. <br /> Sawgrass Expressway and 1-75 Interchange <br /> Ft. Lauderdale, Florida <br /> Mr. Haskins managed the repair of the interchange post tension system, using Ground <br /> Penetrating Radar, Olympus video scope to document the condition of the post tension system <br /> and advanced Vacuum Grouting techniques to locate and remediate tendon voids. Key to the <br /> success of this project is data management of over 3,000 video files of tendon inspection, 6,000 <br /> still photos documenting bridge inspection and written reports to support each type of inspection <br /> and repair. <br /> Hilton Crystal City <br /> Crystal City VA <br /> Mr. Haskins managed the complete rehabilitation of the Hilton Crystal City Hotel Parking <br /> Garage. The Project scope included the complete removal of the entrance and exit ramps and <br /> large section of the parking garage concrete parking deck, removal of the hotel entrance. As the <br /> hotel was occupied during construction, communication and coordination were vital in bringing <br /> this project to a successful completion. <br /> L. Iron Sky Response to the City of Sunny Isles Beach Request For Proposal#12-09-01 <br /> Section 3 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.