My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Aware Digital
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-09-01 Automated License Plate Recognition
>
Responses
>
Aware Digital
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2012 2:46:13 PM
Creation date
10/4/2012 2:21:11 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Automated License Plate Recognition
Bid No. (xx-xx-xx)
12-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Audible, visible and electronic alarm notification for bad drives <br /> • Battery powered UPS <br /> • Redundant power supplies on all servers <br /> Anticipated street closure requirements <br /> Aware Digital has installed multiple projects requiring street closures in the past and has <br /> used off-duty law enforcement to provide job site security. This proposal does not <br /> include the cost of all off duty details and any cost in the coordination and permitting <br /> with the City of Sunny Isles Beach. Street closures if required will be coordinated <br /> through all the proper entities and with the City. <br /> Aware Digital has determined that the key milestone for moving this project forward will <br /> be as follows: <br /> • Project Kick-Off <br /> • Final Permit Set Completion <br /> • Permit Approval <br /> • Each objective also constitutes a significant milestone <br /> • Project Sign Off <br /> Plan to Prevent Down Time and Data Loss <br /> Aware Digital, Inc. has designed the proposed system to be both cost effective and <br /> resilient at the same time. The following items are proposed to prevent system down <br /> time: <br /> • All node positions have an internal UPS unit to prevent system down time from <br /> power outages. <br /> • All equipment uses industry standard and approved lightning suppression and <br /> NEC grounding techniques to minimize damage from lightning and power surges. <br /> • All equipment on the system will be monitored by a network monitoring system <br /> (NMS) installed in the Municipal Complex. This will allow for instant notifications <br /> of equipment malfunction and/or failure. <br /> Plan to Prevent Down Time <br /> Aware Digital has designed the proposed system to be both cost effective and resilient <br /> at the same time. The following items are proposed to prevent system down time: <br /> Aware Digital Inc. Request for Proposal No. 12-09-01 Page 21 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.