Laserfiche WebLink
ALER/IMT <br /> SCOPE OF WORK <br /> Installation / Electrical <br /> The L-3 Team will be responsible for the installation of all equipment. We will utilize <br /> existing electrical circuits at the proposed equipment locations. It is presumed that <br /> power "at the pole" will be provide by the City (the City will provide power to the pole <br /> inside a pullbox following NEC Spec & Code). Installation of new electrical circuits is <br /> beyond the scope of this proposal. <br /> Equipment <br /> L-3 will provide the ALPR camera systems (cameras, roadside CPU's, mounting <br /> hardware, camera cabling and application software) as well as the back office server <br /> and management application. <br /> Communications <br /> L-3 have not included communications infrastructure in this initial offering. The <br /> communications will be responsibility of the City. It is assumed that the city shall provide <br /> all cellular communications devices and services for this project. This includes L3 <br /> specified Cellular Modems, and all associated Cellular provider service fees and costs. <br /> 20 J L-3 Mobile-Vision <br />