My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2675
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2021 10:17:42 AM
Creation date
4/5/2017 10:48:42 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2675
Date (mm/dd/yyyy)
03/16/2017
Description
Awd Bid No. 16-09-02 & Neg. Agmt w/Jorda Enterprises, Inc. for Gov’t Ctr HVAC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��•� 'I <br /> WS kifit 2:11 <br /> a lP <br /> JORA MECHANICAL CONTRACTOR <br /> CM#C008499 CF#C019060 PE#0012743 CC#0014777 <br /> 1510 N.W.79`h AVENUE DORAL,FL 33126 <br /> TEL(305)262-0095 FAX(305)597-7020 <br /> 1st Year Preventive Maintenance <br /> April 3, 2017 <br /> Sunny Isles Beach Government Center <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, FL 33160 <br /> RE: New HVAC Chiller System No. 16-09-02 <br /> Jorda Mechanical Contractor to provide (1) one-year parts and labor warranty against manufacturer <br /> defects and craftsmanship for entire chiller package from date of Start-up including a first year <br /> monthly preventive maintenance. <br /> First Year Annual Maintenance to be charged at an additional $ 3,500.00 per year <br /> First Year Monthly Maintenance <br /> Scone of Work (Monthly) <br /> o Check chiller display and log in of pertinent pressures and temperatures <br /> o Open electrical panels and check pertinent amperage and voltage readings <br /> o Tighten all electrical connections <br /> o Check cooling tower water levels adjust float valve as necessary <br /> o Check all VFD cooling fans for proper operation <br /> o Wipe down equipment <br /> o Maintain log sheets for chiller, cooling tower, and pumping station in Pump room visible <br /> on bulkhead <br /> ATTACHMENT "C" <br />
The URL can be used to link to this page
Your browser does not support the video tag.