Laserfiche WebLink
I/ 1 <br /> 1st Yearly Chiller Annual Maintenance <br /> Scone off Work (Annual) <br /> o System shutdown and electrical lock out/tag out <br /> o Isolate condenser and drain/Remove end covers <br /> o Clean heat exchanger tubes with rotary nylon brush <br /> o Though roughly rinse all tubes with fresh water <br /> o Isolate and drain cooling Tower <br /> o Remove and clean all pump strainers <br /> o High pressure clean basin and tower bulkheads <br /> o Clean flanges/Install new Gaskets/reassemble end covers <br /> o Clean all filters and solid separator on water treatment Skid <br /> o Check for leaks/bleed air/refill condenser refill cooling tower <br /> o Take oil sample and submit laboratory report of wear and contamination levels <br /> o Disassemble compressor starter and clean contacts with greaseless lubricant <br /> o Meg Ohm compressor motor windings <br /> o Place system in operation <br /> o Log in all pressures and temperatures <br /> S.- -- -Iy, <br /> • - No -ga <br /> Project Manager <br /> S1B <br />