Laserfiche WebLink
and as herein specified. Moisten subgrade as required to provide a uniform <br /> dampened condition at the time concrete is placed. Do not place concrete around <br /> manholes or other structures until they have been brought to the required grade <br /> and alignment. Concrete shall be deposited and consolidated in such a manner <br /> as to prevent the formation of voids or honeycomb pockets, however, do not <br /> overconsolidate concrete so as to cause segregation of aggregate in concrete. <br /> Consolidate with care to prevent dislocation of joint devices. Deposit and spread <br /> concrete in a continuous operation. <br /> 3.05 JOINT CONSTRUCTION <br /> A. Construct expansion (isolation), construction (weakened-plane) and construction <br /> joints true to line with face perpendicular to surface of the pavement as shown on <br /> approved Paving Construction Plan. Joints shall be provided in both the <br /> longitudinal and transverse contraction joints shall be fifteen (15) feet. On radius <br /> sections, maximum joint spacing shall be twelve (12) feet as measured along the <br /> longest edge of the curve. <br /> 1. Contraction (Weakened-plant) joints: Provide contraction joints for a <br /> depth not greater than one-fourth (1/4) nor less than one-fifth (1/5) the <br /> pavement thickness. Contraction joints must be continuous across the <br /> slab unless interrupted by a full depth joint filler and must extend <br /> completely through any integral curbs. Contraction joint alignment may be <br /> skewed or warped where necessary to reach points of stress <br /> concentration. Contraction joints are to be constructed at the Paving <br /> Subcontractor's option as follows: <br /> a. Sawed Joints: Form contraction joints using saws <br /> equipped with shatterproof abrasive or diamond rimmed <br /> blades. Cut joints into concrete paving as soon as the <br /> surface will not be raveled or otherwise damaged by the <br /> cutting action. Joints must be completed between four (4) <br /> and eighteen (18) hours after paving has been placed. <br /> b. Premolded Inserts: Use embedded strips of premolded <br /> filler joint material embedded while concrete is still in the <br /> plastic state. Premolded filler must be flush with the <br /> surface of the concrete paving. <br /> c. Hand-formed: Contraction joints may be installed in the <br /> concrete paving with the use of a mason's hand groover <br /> utilized while the concrete is in the plastic state. Hand <br /> groover must be of sufficient depth to leave a finished joint <br /> greater than "015 and less the "0"/4. Hand-formed joints <br /> must have a radius along the joint edge equal to Y. inch. <br /> 2. Construction Joints: Place full depth construction Joints at the end of <br /> concrete pours and at locations where placement operations are stopped <br /> for a period of thirty (30) minutes or more except where such pours <br /> terminate at expansion joints. <br /> 3. Expansion (Isolation) Joints: Provide Expansion Joints to isolate fixed <br /> objects abutting or within the paved area. They must contain premolded <br /> joint filler for the full depth of the paving slab. <br /> 3.06 FINISHING <br /> 08/12 02512-3 11-4179 <br />