Laserfiche WebLink
A. Perform concrete finishing using machine and hand tools as required. Adding <br /> water to the surface of the concrete to assist in finishing operations shall not be <br /> permitted. A uniform gritty non-slip finish shall be provided by brushing the <br /> surface with a stiff-bristled broom or by dragging a "burlap drag" over the surface <br /> just before the water sheen disappears. <br /> 3.07 CURING <br /> A. Concrete shall be cured by protecting it against loss of moisture and mechanical <br /> injury for at least three (3) days after placement. Cover concrete with burlap, <br /> sawdust or shavings and keep wet. Cover concrete until final clean-up to prevent <br /> damage. <br /> 3.08 PAVING PRECAUTIONS <br /> A. Form offsets that are used at radius points to provide continuity in paving <br /> operations should be at least one (1) foot in order to avoid slivers of <br /> concrete that may be broken off. <br /> B. Construction traffic shall not use the area designated for passenger car <br /> parking. <br /> END OF SECTION <br /> 08112 02512-4 114179 <br />