My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
placing and compacting of the limerock base, the preparation and priming of the <br /> base, the placing and maintaining of the surface treatment, all as specified herein <br /> and as shown on the Drawings. <br /> B. The width of all repairs shall extend at least 12 inches beyond the limit of the <br /> damage or as shown on the Drawings. The edge of the pavement to be left in <br /> place shall be saw cut to a true edge and should provide a clean edge to abut the <br /> repair. The line of the repair shall be reasonably uniform with no unnecessary <br /> irregularities. <br /> 3.03 TESTING <br /> A. The Contractor shall have and pay for density, soil bearing, materials and such <br /> other tests performed as it may deem necessary. The Contractor shall'fully <br /> cooperate with the testing agency. Should any test indicate that any portion of <br /> the materials or workmanship does not comply with these Specifications, a retest <br /> shall be performed at the Contractor s expense. If the retest confirms the first <br /> test, that portion of the work shall be removed and replaced or reworked at no <br /> additional cost to the Owner until satisfactory compliance is attained. <br /> 3.04 PARKING AND TRAFFIC STRIPES <br /> A. The Contractor shall paint the stripes indicated on the Drawings. The paint shall <br /> be applied in strict accordance with printed specifications of the manufacturer of <br /> the paint being applied, and the latest Florida Department of Transportation <br /> Standard Specifications. Unless otherwise indicated the width of stripes shall be <br /> 6". <br /> END OF SECTION <br /> 08/12 02513-3 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.