My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Hot Weather Concreting: Proposed methods for compliance with hot weather <br /> production and delivery requirements of ACI 305. <br /> C. Certificates: <br /> 1. Submit with each design mix, laboratory test reports and mill and <br /> manufacturer's certificates attesting to conformance of ingredients with <br /> specifications. <br /> 2. In case the sources, brand of characteristic properties of the ingredients <br /> need to be varied during the term of the Contract, submit revised laboratory <br /> mix report for approval. <br /> 3. Submit certification for each admixture used certifying that it is identical in <br /> Composition to the sample used for design mix approval, and is compatible <br /> with all other materials in the design mix and is contained in the current List <br /> of Approved Products of the State of Florida Department of Transportation, <br /> Office of Materials and Research. <br /> 4. Chloride determination shall be provided by the Contractor who will certify <br /> that there are no chloride contents in the concrete. Properly executed <br /> certificates showing the chloride content will be required for acceptance of <br /> any structural element constructed under these specifications. The Engineer <br /> reserves the right to monitor the chloride content through test on samples <br /> obtained by his own personnel. <br /> D. Batch Tickets: Submit a delivery ticket from the concrete supplier with each batch <br /> delivered to the site setting forth the following information: <br /> 1. Name of ready-mix batch plant. <br /> 2. Serial number of ticket. <br /> 3. Date and truck number. <br /> 4. Name of contractor. <br /> 5. Job number. <br /> 6. Specific classes or designation of concrete. <br /> 7. Quantity of concrete (cubic yards). <br /> 8. Time loaded or first mixing of cement and aggregates. <br /> 9. Water added by receiver of concrete Of any), and his initials. <br /> 10. Type and name of admixture, and amount of it. <br /> 08/12 03305-4 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.