Laserfiche WebLink
TABLE OF CONTENTS <br /> Paae <br /> ARTICLE 1 -DEFINITIONS AND TERMINOLOGY 6 <br /> 1.01 Defined Terms 6 <br /> 1.02 Terminology 8 <br /> ARTICLE 2-PRELIMINARY MATTERS 9 <br /> 2.01 Delivery of Bonds and Evidence of Insurance 9 <br /> 2.02 Copies of Documents 9 <br /> 2.03 Commencement of Contract Times;Notice to Proceed 9 <br /> 2.04 Starting the Work 9 <br /> 2.05 Before Starting Construction 9 <br /> 2.06 Preconstruction Conference 9 <br /> 2.07 Initial Acceptance of Schedules 9 <br /> ARTICLE 3-CONTRACT DOCUMENTS: INTENT,AMENDING, REUSE 10 <br /> 3.01 Intent 10 <br /> 3.02 Reference Standards 10 <br /> 3.03 Reporting and Resolving Discrepancies 10 <br /> 3.04 Amending and Supplementing Contract Documents 11 <br /> 3.05 Reuse of Documents 11 <br /> 3.06 Electronic Data 11 <br /> ARTICLE 4-AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS <br /> ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 11 <br /> 4.01 Availability of Lands 11 <br /> 4.02 Subsurface and Physical Conditions 12 <br /> 4.03 Differing Subsurface or Physical Conditions 12 <br /> 4.04 Underground Facilities 13 <br /> 4.05 Reference Points 13 <br /> 4.06 Hazardous Environmental Condition at Site 13 <br /> ARTICLE 5-BONDS AND INSURANCE 14 <br /> 5.01 Performance, Payment, and Other Bonds 14 <br /> 5.02 Licensed Sureties and Insurers 15 <br /> 5.03 Certificates of Insurance 15 <br /> 5.04 Contractor's Liability Insurance 15 <br /> 5.05 Owner's Liability Insurance 16 <br /> 5.06 Properly Insurance 16 <br /> 5.07 Waiver of Rights 17 <br /> 5.08 Receipt and Application of Insurance Proceeds 17 <br /> 5.09 Acceptance of Bonds and Insurance; Option to Replace 17 <br /> 5.10 Partial Utilization, Acknowledgment of Properly Insurer 18 <br /> ARTICLE 6-CONTRACTOR'S RESPONSIBILITIES 18 <br /> 6.01 Supervision and Superintendence 18 <br /> 6.02 Labor, Working Hours 18 <br /> 6.03 Services, Materials, and Equipment 18 <br /> 6.04 Progress Schedule 18 <br /> 6.05 Substitutes and'Or-Equals" 19 <br /> 6.06 Concerning Subcontractors, Suppliers, and Others 20 <br /> 6.07 Patent Fees and Royalties 21 <br /> 6.08 Permits 21 <br /> 6.09 Laws and Regulations 21 <br /> 6.10 Taxes 22 <br /> 6.11 Use of Site and Other Areas 22 <br /> 6.12 Record Documents 22 <br /> 6.13 Safely and Protection 22 <br /> 6.14 Safety Representative 23 <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright 02002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700-2 <br /> 08/12 11-4179 <br />