My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.15 Hazard Communication Programs 23 <br /> 6.16 Emergencies 23 <br /> 6.17 Shop Drawings and Samples 23 <br /> 6.18 Continuing the Work 24 <br /> 6.19 Contractor's General Warranty and Guarantee 24 <br /> 6.20 Indemnification 24 <br /> 6.21 Delegation of Professional Design Services 25 <br /> ARTICLE 7-OTHER WORK AT THE SITE 25 <br /> 7.01 Related Work at Site 25 <br /> 7.02 Coordination 26 <br /> 7.03 Legal Relationships 26 <br /> ARTICLE 8-OWNER'S RESPONSIBILITIES 26 <br /> 8.01 Communications to Contractor 26 <br /> 8.02 Replacement of Engineer 26 <br /> 8.03 Furnish Data 26 <br /> 8.04 Pay When Due 26 <br /> 8.05 Lands and Easements; Reports and Tests 26 <br /> 8.06 Insurance 26 <br /> 8.07 Change Orders 26 <br /> 8.08 Inspections, Tests, and Approvals 26 <br /> 8.09 Limitations on Owner's Responsibilities 27 <br /> 8.10 Undisclosed Hazardous Environmental Condition 27 <br /> 8.11 Evidence of Financial Arrangements 27 <br /> ARTICLE 9- ENGINEER'S STATUS DURING CONSTRUCTION 27 <br /> 9.01 Owner's Representative 27 <br /> 9.02 Visits to Site 27 <br /> 9.03 Project Representative 27 <br /> 9.04 Authorized Variations in Work 27 <br /> 9.05 Rejecting Defective Work 27 <br /> 9.06 Shop Drawings, Change Orders and Payments 28 <br /> 9.07 Determinations for Unit Price Work 28 <br /> 9.08 Decisions on Requirements of Contract Documents and Acceptability of Work 28 <br /> 9.09 Limitations on Engineer's Authority and Responsibilities 28 <br /> ARTICLE 10-CHANGES IN THE WORK; CLAIMS 28 <br /> 10.01 Authorized Changes in the Work 28 <br /> 10.02 Unauthorized Changes in the Work 29 <br /> 10.03 Execution of Change Orders 29 <br /> 10.04 Notification to Surety 29 <br /> 10.05 Claims 29 <br /> ARTICLE 11 -COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK 30 <br /> 11.01 Cost of the Work 30 <br /> 11.02 Allowances 31 <br /> 11.03 Unit Price Work 31 <br /> ARTICLE 12- CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES 32 <br /> 12.01 Change of Contract Price 32 <br /> 12.02 Change of Contract Times 33 <br /> 12.03 Delays 33 <br /> ARTICLE 13-TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK <br /> 33 <br /> 13.01 Notice of Defects 33 <br /> 13.02 Access to Work 33 <br /> 13.03 Tests and Inspections 33 <br /> 13.04 Uncovering Work 34 <br /> 13.05 Owner May Stop the Work 34 <br /> 13.06 Correction or Removal of Defective Work 34 <br /> 13.07 Correction Period 34 <br /> 13.08 Acceptance of Defective Work 35 <br /> 13.09 Owner May Correct Defective Work 35 <br /> ARTICLE 14- PAYMENTS TO CONTRACTOR AND COMPLETION 36 <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright 3 2002 National Society of Professional Engineers for EJCDC. All rights resen'ed. <br /> 00700-3 <br /> 03/12 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.